Show/Hide
Town Hall and most staffed facilities will be closed Nov. 28 and 29 in observance of Thanksgiving. Curbside collections and GoCary will be affected by the holiday as well. Learn more.

Commercial Plan Form

Print
Press Enter to show all options, press Tab go to next option
RSS

Project Title: ______________________________________________
Type of Project [ ] New              [ ] Expansion                 [ ]Exempt

Basis for exemption_________________________________________

 

Part I. Riparian Buffers

Area includes riparian buffers?     [ ] No                [ ] Yes              [ ]Exempt

If yes,                                                   [ ] 50 foot          [ ] 100 foot

River Basin?                                          [ ] Neuse           [ ] Cape Fear

Basis for exemption_________________________________________

Show buffers on site plan.


Part II. Nitrogen Calculations (Method 2, Appendix C):

a.       Site Information

Total area of property incl. R/W

 

 

Denuded Area

 

 

Impervious Area incl. R/W

 

 

Managed open space

 

 

Protected open space

 

 

 

b. Pre-development loading:

 

 

 

Area

 

 

TN export coeff.

 

TN export

from use

Type of Land Cover

(acres)

(lbs/ac/yr)

(lbs/yr)

Permanently protected undisturbed open space (forest, unmown meadow)

 

 

0.60

 

Permanently protected managed open space (grass, landscaping, etc.)

 

 

1.20

 

Impervious Area

 

21.20

 

TOTAL

 

 

 







 

Nitrogen Loading Rate (lbs/ac/yr) = __________

 

c. Post-development loading:

 

 

Area

 

TN export coeff.

TN export

from use

Type of Land Cover

(acres)

(lbs/ac/yr)

(lbs/yr)

Permanently protected undisturbed open space (forest, unmown meadow)

 

 

0.60

 

Permanently protected managed open space (grass, landscaping, etc.)

 

 

1.20

 

Impervious Area

 

21.20

 

TOTAL

 

 

 

 

Nitrogen Loading Rate (lbs/ac/yr) = __________

 

Proposed BMP(s) ________________________

Nitrogen Load after BMPs = ________________

Nitrogen Load Offset by Payments = _________

Net change in on-site N Load = _____________

 

Part III. Control of Peak Stormwater Flow (for 1 year, design storm)

Calculated Pre-development Peak Flow    __________

Calculated Post-development Peak Flow__________

Proposed BMP(s)____________________________

Post BMP Peak Flow _________________________

 

I, the undersigned, certify to the best of my knowledge that the above information is correct (affix seal).