White Oak Creek Greenway Trailhead

Print
Press Enter to show all options, press Tab go to next option
RSS

Project Background

In 2008, staff from Cary, Wake County Public School System (WCPSS) and Wake County worked jointly to identify property suitable for a high school located south of White Oak Creek at the intersection of Green Level Church Road and Roberts Road. The master plan for this high school was also jointly developed between the Town and WCPSS and included a parking lot designated as a future trailhead. The trailhead will provide access to the White Oak Creek Greenway and be maintained by the Town of Cary.

revised layout

In 2013, NCDOT replaced the bridge over White Oak Creek at Green Level Church Road. When the bridge was replaced, the Town funded $395,343 of improvements to the bridge. The bridge was raised to allow for the future grade-separated crossing of Green Level Church Road, so White Oak Creek Greenway could extend to the American Tobacco Trail. Also, a 10’ wide sidewalk with barrier on the bridge will facilitate a connection from the White Oak Creek Greenway to the Green Level High School and trailhead.

Green Level High School, currently under construction, is scheduled to open in the fall of 2017.

Scope

The initial scope of the project is to develop a trailhead parking lot with approximately 20 parking spaces, facilitating a greenway connection to White Oak Creek Greenway, and building future restroom facilities on the site adjacent to Green Level High School. This will be a connection point via Green Level Church Road to White Oak Creek Greenway and ultimately the American Tobacco trail.

The Town will be responsible for the design, construction, renovation, and maintenance of the parking lot and any facilities on the leased property. The general public will have access to the trailhead at all times during the day.

Project Cost and Schedule

The appropriated budget is $185,000 for the design, construction, and administration of the project.

  • Design and permitting completed
  • Spring 2019: Begin construction
  • Spring 2020: Complete construction

Status

Project is currently under construction.

Contact

Paul Kuhn, PLA
Facilities Design & Construction Manager
Transportation & Facilities Department
Town of Cary
(919) 469-4360
paul.kuhn@townofcary.org

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer