Crabtree Creek Trail Weston Parkway Crossing

Print
Press Enter to show all options, press Tab go to next option
RSS

Project Background

Cary contracted with WithersRavenel to conduct a preliminary engineering study on alternatives to link Crabtree Creek Greenway with Weston Trail, crossing over Weston Parkway. The study was completed mid-summer 2019, and included the following alternatives:

  • pedestrian tunnel
  • sidewalks up to Norwell (crosswalk at signal light)
  • at-grade crossing HAWK pedestrian signal

Map of Project Area

Project Schedule 

All three alternatives are being evaluated to find the best option for citizens. Once an alternative has been selected, design will begin. 