9/22/2016:  The existing courts were removed, countless dump truck loads of dirt were hauled off, and grading began.

site prep web


10/14/2016:  Next, the steel framework began to go up on the site.

frame web


11/18/2016:  In a blink of an eye, we had a full frame on the site!

roof frame web


12/2/2016:  Then came half of the roof....

half roof web


1/26/2017:  ...and then the entire roof appeared!

covered court inside for web


2/6/2017:  Currently, siding is going up!

front siding web


3/31/2017:  The concrete was poured!

CTP - Covered Court Concrete Pouring


5/9/2017: The concrete is curing while fencing and fans are installed.

Inside Covered Court View


6/16/2017:  The sod and area landscaping has been installed.  

New Building

 

 

 

 

 

 

 

 

 


7/17/2017: The courts are finished. There are still a few items on the building that will need to be completed, but the courts are ready for lots of tennis!