DEVELOPMENT PLAN REPORT APPLICATION:
05-SP-002, Triangle Transit Authority Downtown Summary:
The plans propose a train platform along the north side of the
existing railroad tracks. The
platform will be 350 long and elevated approximately four feet above
the tracks. The platform
will be covered with concrete pavers.
The canopy covering the platform will be 120 long and consist
of three hip-shaped roof forms clad with a standing seam metal roof of
galvalume color. The columns
for the roof structure will be clad in brick.
The handrails, fencing, and guardrails will be coated in a black
epoxy finish. The parking lot will
contain 175 parking spaces, with appropriate landscape buffering and a
fence to the north. A bus
shelter would be installed on both
TOWN
OF
ZONING
AND LAND USE PLAN COMPLIANCE: Current
Zoning: Overlay District:
Town
Center
Sub
District: Office and
Institutional (O&I) Town Limits: The property is inside Carys town limits. Land
Use Compliance: The
Land Use Plan designates the parcels as Office and Institutional,
permitting a public transportation facility. MEETING
SCHEDULE: Action: Plan forwarded to Town Council for approval. TOWN
COUNCIL ACTION Action:
The
plan was tabled until the December 15, 2005 Town Council meeting in
order to allow the plan to be STAFF
RECOMMENDATION: Staff
recommends approval of the plan. PLANNING:
Staff Contact:
Bob Benfield, 469-4045, Email:
bob.benfield@townofcary.org Landscaping: The plan complies with all
landscape requirements. The
plan provides the required landscaping surrounding and within the
parking area, and in the area of the bus shelters.
The existing landscaping along Building
Elevations: Building Height: 184
above the platform. The
platform will be elevated 43 above the railroad tracks. Building Size: 350
long platform with 120 long canopy, with a total area of 7,700 square
feet Building Materials and Colors: Concrete
pavers covering the walking surface, red-brown brick piers supporting
the standing seam metal roof. The
roof will be galvalume, a galvanized metal color.
The guardrails, handrails, and fencing will be clad in a black
epoxy finish TRAFFIC:
Staff Contact:
Dick Moore, 462-3937, Email:
dick.moore@townofcary.org A
traffic impact study was prepared by Town of ROADWAY
DESIGN: Staff
Contact: Tammy Spivey,
462-3933, Email: tammy.spivey
@townofcary.org The
proposed UTILITIES:
Staff Contact:
Shuyan Tian, 469-4381, Email: shuyan.tian@townofcary.org This development has
access to STORM
WATER: Staff Contact:
Tom Horstman, 469-4347, Email:
tom.horstman@townofcary.org The project will be
required to comply with all Town of PROPERTY
OWNER NOTIFICATION: Adjoining
property owners were notified during staff's initial review of this
plan. Staff has received no
inquiries objecting to the request regarding this proposed development Reference
Information: Development Plan Issues:
The
purpose of a rezoning is to evaluate the appropriateness of this land
use for these parcels of land. Specific
development requirements related to the technical aspects of land
development, such as access, storm water management, road improvements,
utility line placement, road connectivity and landscape plantings, are
not considered during the rezoning process.
However, all of these development issues must be addressed for
compliance with existing requirements spelled out in the Land
Development Ordinance (LDO) when the site or subdivision plan is
submitted. All such
requirements can be found at http:vic.townofcary.org.
|
||||||||||||||||||||||||||