Project Title: ______________________________________________
Type of Project [
] New [ ] Expansion [ ]Exempt
Basis for
exemption_________________________________________
Area includes riparian buffers? [ ] No [ ]
Yes [ ]Exempt
If yes, [
] 50 foot [ ] 100 foot
River Basin? [
]
Basis for
exemption_________________________________________
Show buffers on site plan.
Part II. Nitrogen Calculations (Method 2, Appendix C):
a.
Site Information
|
Total area of property incl. R/W |
|
|
|||
|
Denuded Area |
|
|
|||
|
Impervious Area incl. R/W |
|
|
|||
|
Managed open space |
|
|
|||
|
Protected open space |
|
|
|||
|
b. Pre-development loading: |
Area |
TN
export coeff. |
TN
export from
use |
||
|
Type of Land Cover |
(acres) |
(lbs/ac/yr) |
(lbs/yr) |
||
|
Permanently protected undisturbed open
space (forest, unmown meadow) |
|
0.60 |
|
||
|
Permanently protected managed open space
(grass, landscaping, etc.) |
|
1.20 |
|
||
|
Impervious Area |
|
21.20 |
|
||
|
TOTAL |
|
|
|
||
Nitrogen Loading Rate (lbs/ac/yr) = __________
|
c. Post-development loading: |
Area |
TN
export coeff. |
TN
export from
use |
|
Type of Land Cover |
(acres) |
(lbs/ac/yr) |
(lbs/yr) |
|
Permanently protected undisturbed open
space (forest, unmown meadow) |
|
0.60 |
|
|
Permanently protected managed open space
(grass, landscaping, etc.) |
|
1.20 |
|
|
Impervious Area |
|
21.20 |
|
|
TOTAL |
|
|
|
Nitrogen Loading Rate (lbs/ac/yr) = __________
Proposed BMP(s) ________________________
Nitrogen Load after BMPs = ________________
Nitrogen Load Offset by Payments = _________
Net change in on-site N Load = _____________
Calculated
Calculated
Proposed BMP(s)____________________________
Post BMP Peak Flow _________________________
I, the undersigned, certify to the best of my knowledge
that the above information is correct (affix seal).