Overview

The Town of Cary budgets annually to restore or replace deteriorating sewer mains. Typically, replacement is the best option. Six-inch diameter lines that are in poor condition are too small to maintain adequately. Larger lines may need replacement if defects have occurred or the area they serve has grown.

Fall 2002 Update

2001 utility upgrades project list:

  • Heater Alley - 6-inch diameter sewer main to be replaced with 8-inch diameter line. Length - 549 feet. Expected cost - $49,542.41
  • Gray Street - 6-inch diameter sewer main to be replaced with 8-inch diameter line from North Harrison Avenue to the end of Gray Street. Length - 671 feet. Expected cost - 70,494.98
  • Clay Street - 6-inch diameter sewer main will be replaced from Eask Park Street to Waldo Street. Length - 1,005 feet. Expected cost - $116,567.90. (The Clay Street culvert will also be replaced during this construction project at an estimated cost of $168,812.19.)
  • Manchester Drive - 8-inch diameter sewer main that runs parallel to the stream from near 951 Manchester Drive to 1017 Manchester Drive to be replaced with 12-inch diameter line. Length - $1,529 feet. Expected cost - $128,848.11

Construction start - July 2002
Scheduled completion - June 2003
Contractor - J.F. Wilkerson Contracting Company

Contact

The Town of Cary welcomes public comment on this project. If you have any comments or questions, please respond to:

Jamie Revels, P.E.
Town of Cary Engineering Department
P.O. Box 8005
Cary, NC 27512-8005
(919) 462-3836
jrevels@ci.cary.nc.us