Overview

The Town of Cary plans to widen Kildaire Farm Road from Palace Green near Lochmere Golf Club 1.7 miles southward beyond Autumngate Drive near Mill Pond Village to relieve congestion. The project includes replacement of the bridge over Swift Creek.

Summer 2007 Update

Construction is scheduled to begin late August 2007 and take about 2 years to complete. CC Mangum is the contractor. This project will require periodic lane closures and traffic shifts through the duration of construction.

Details

The road will be five lanes without a median from 500 feet south of Autumngate Drive to Steep Bank Drive and four lanes with a median from Steep Bank Drive to Palace Green. The proposed right-of-way varies from 92 to 105 feet. Currently, it ranges from 60 to 100 feet.

Outside lanes will be wider to accommodate bicycles, and sidewalks will be installed on both sides. The sidewalk will be 10 feet wide between Lochmere Golf Cub and Hemlock Bluffs. Connector trails will be added for access to Swift Creek greenway.

Background

The Town has budgeted a total of $14,076,201 to widen Kildaire Farm Road from 1010 Road to Palace Green (Lochmere Golf Club Entrance). The state is contributing $1,231,201 toward bridge design and construction.

Contact

For questions, comments, or to see plans regarding this project contact:

Russ Overton, P.E.
Town of Cary Engineering Department
P.O. Box 8005
Cary, NC 27512-8005
(919)469-4036
russ.overton@townofcary.org

Patrick Lee, PLS
Real Estate Manager
Town of Cary Engineering Department
(919) 469-4037
patrick.lee@townofcary.org

Town of Cary homepage