Overview

The Town plans to widen approximately 1.3 miles of Carpenter Fire Station Road from NC 55 to Cary Glen Boulevard. The existing two-lane roadway is to be widened to a four-lane median divided roadway within a 100’ right-of-way. See map.

Plans require N.C. Department of Transportation review since the state maintains the road.

Schedule (tentative)

Design Complete - Winter 2008/2009
Right-of-way & easement acquisition complete - Summer 2009
Construction begins - Fall 2009
Construction ends - Fall 2010

Details

• 4-lane median divided
• curb, gutter and sidewalks on both sides
• wide outside lanes to accommodate bicycles