1.1        Purpose.. 1

1.2        Applicability.. 1

1.3        General Development Intent.. 2

1.3.1     Land Uses. 2

1.3.2     Subdistricts Created and Defined. 2

1.3.3     Vehicular and Pedestrian Circulation. 4

1.3.4     Buffers, Open Space and Recreational Facilities. 6

1.3.5     Utilities. 8

1.3.6     Storm Drainage. 8

       1.3.7      Phasing......................................................................................................................... 9

 

1.4        Allowed Uses. 10

1.5        Standards for New Development.. 11

1.5.1    Compliance with Development Plan Procedures Required. 11

1.5.2    General Development Requirements. 11

1.6        Specific Development Standards. 13


1.1        Purpose

The Fryar PDD is an approximately 94.0-acre planned development that combines a mix of very low density and medium density detached and attached residential uses, a small commercial site and common open space.  The plan represents an attempt to achieve a balance among current Southwest Cary Area Plan concepts, Northwest Plan concepts, the influences of I-540, market dynamics and the adopted design philosophy for the development. 

1.2        Applicability

This zoning district shall apply to the geographic land area shown on the following map and the Official Zoning Map as adopted by Town Council on October 24, 2002 or as it was amended:

 

 

 

 



1.3        General Development Intent

1.3.1     Land Uses

The masterplan provides 322 dwelling units representing a project density of 3.40 dwelling units per acre.  The site is located in an area that falls within both the Northwest Area Plan and the Southwest Area Plan and this masterplan follows the requirements established in those plans.  The one deviation is the small commercial area located because of the influences established by the I-540 corridor just to the west of the site.

 

1.3.2     Subdistricts Created and Defined

A summary of the subdistricts created within the Fryar PDD with their size, density and total units is presented below:

Subdistrict

Acres

Max. Density

Min. Density

Proposed Units

Commercial Sq. Footage

R-1

24.5

2.2

-

54

--

R-2

65.4

8.0

3.0

268

--

C-1

2.5

--

 

--

22,000

TOTAL

 92.4

 

 

       322

22,000

Note:  The remaining site area of 1.94 acres lies within primary road rights-of-way.  The total site area is 94.59 acres.

A breakdown of the standards governing development in each of the subdistricts is presented in Section 1.6.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LAND USE PLAN

 

 

 

 

 

 

 

 


1.3.3     Vehicular and Pedestrian Circulation

Fryar PDD proposes vehicular access directly onto the proposed Morrisville Parkway Extension through the extension of Highcroft Drive. Access to the site will also be provided along the southern boundary by Green Hope School Road.  Road widening for Green Hope School Road will be completed with development of the project phases adjacent to the roadway.

 

 

 

 


 

 

 

 

 

 

 

 

 

Circulation Plan

 

 

 


1.3.4   Buffers, Open Space and Recreation Dedication

There are a number of significant open space features adjacent to and within the Fryar development that help define the character for the community.  The stream buffers within the site are important in and of themselves, by additionally buffering off-site uses.  As a part of the open space system, a 10’ greenway trail will be located in the northern stream buffer and dedicated to the Town as part of its greenway system as well as multi-purpose trails along Morrisville Parkway and Highcroft Drive.   This trail will provide an east-west connector identified in the Northwest Area Plan.  The cost of this trail and the easement where it is located will be credited against the required recreation payment for this project.  Any greenway bridge will be credited the exact cost of the bridge as opposed to a linear footage credit.

 

 

Fryar Open Space System

Pond & Stream Buffers

   21.41 Acres

Streetscapes & Landscape Strips

     3.98

 

 

 

 

TOTAL

   25.39 Acres

 

 

 

 

 

Open Space Definitions

 

Stream buffer:  Undisturbed land area adjacent to streams, ponds or channels.  No land disturbance is allowed except for general clean-up, road crossings, pedestrian circulation, utilities, constructed wetlands and other stormwater devices, and for any other activity also permitted by the Town of Cary LDO.

 

Streetscape:  Land area located along roadways with the purpose of providing a transition from vehicular circulation into the adjacent sites through the use of existing and/or proposed plant material, berms, walls, sidewalks, trails and other hardscape features.  Stormwater devices required may be located in the outer 10’ away from the road.  In areas where berms are not included, vegetation will typically be undisturbed.  In those instances where existing plant material is deficient or has been disturbed during construction, additional plant material will be provided to meet Town of Cary streetscape standards.

 

Landscape strip:   A permanent easement reserved to provide horizontal separation between land uses.  Typically, existing vegetation would remain unchanged, but in those instances where existing plant material is deficient or has been disturbed during construction, additional plant material will be provided to bring the area to a Town of Cary Type B buffer standard.

 

 

 

 

 

 

 

 

 

 

Open Space Plan

 


1.3.5     Utilities

Water and sanitary sewer will be provided to this tract via connections to and improvements to the existing Town of Cary utility lines.  There will be an off-site extension of the sanitary sewer outfall along Panther Creek.  The total average daily flow anticipated for this project is as follows:

 

  322 Residential Units  x   280 GPD/Unit        =      90,160 GPD

 

An existing Town of Cary water main existing in Green Hope School Road will serve the property.  Additionally, Public Service gas, Southern Bell, Time Warner Cable, Progress Energy and other various public utilities are anticipated to provide services to this property.  All utilities shall be constructed underground within the public rights-of-way, where practicable.  All construction associated with utility infrastructure shall be completed in accordance with the Town of Cary standard specifications and details. 

 

1.3.6     Storm Drainage

The Fryar PDD drains to Panther Creek, which feeds into Jordan Lake in the Cape Fear River Basin.  The project is subject and will adhere to Federal, State and Local stormwater regulations.  These requirements include:

 

US Army Corps of Engineers

·                Wetlands Protection (Clean Water Act, Section 404)

 

NCDENR – Division of Water Quality

·                Wetlands Protection

·                401 Water Quality Certification

·                Neuse River Riparian Buffers

 

Town of Cary

·                Stormwater Management Plan for New Development

·                Sediment & Erosion Control

·                Reservoir Watershed Protection Districts (Jordan Lake Watershed)

 

The proposed development will be planned and constructed in a manner emphasizing the protection of the existing wetland areas, riparian buffers and streams.  Disturbance of wetland and riparian buffer areas shall be prohibited except where required to construct road crossings, utilities, greenways, stormwater best management practices (BMPs) and other items specifically allowable by the US Army Corps of Engineers, NCDENR, and the Town of Cary.  Disturbance of riparian buffers for the above mentioned practices would be limited to those necessary to promote a safe, functional and desirable community.  Please note that greenway locations within riparian buffers shall only occur within Zone 3 of these buffers.

 


1.3.7     Phasing

For reasons of accessibility, exposure, the logical routing of utilities, and the desire to market the property off of existing roadways (primarily Green Hope School Road), construction and development activities within Fryar will begin from the south.  Typically, development would then proceed northward with streets and utilities extending into adjacent properties as development occurs.  All requirements proposed in the Traffic Impact Analysis and in Town ordinances will be met unless waivers or variances remove the requirement.

 


 

 

1.4        Allowed Uses

Principal uses allowed in each subdistrict are detailed in the Use Table contained in this Section.  Accessory or ancillary uses normally associated with such primary uses and which do not constitute more than 10% of the total floor area on a site are allowed in conjunction with the principal use.

 

 

TABLE OF FRYAR PLANNED DEVELOPMENT DISTRICT USES

P = Permitted Use; S = Special Use (in accordance with Section 3.8 of the Cary Land Development Ordinance)

Use Category

USE TYPE

R-1

R-2

C-1

 

RESIDENTIAL USES

 

 

 

 

 

 

Detached Dwelling

P

P

-

 

 

Neighborhood Recreational Facility

P

P

-

 

 

Home Occupations

P

P

-

 

 

Townhome

-

P

-

 

 

Single-Family Attached

-

P

-

 

 

Patio Home

-

P

-

 

 

Zero Lot Line

-

P

-

 

NON-RESIDENTIAL USES

 

 

 

 

 

 

Life Care Community

-

P

-

 

 

Group Living

-

P

-

 

 

Home Occupations

P

P

-

 

 

Day Care Center

-

-

P

 

 

Drug Store

-

-

P

 

 

Gas, Convenience

-

-

P

 

 

Office

-

-

P

 

 

Retail

-

-

P

 

 

Restaurant

-

-

P

 

 

 


1.5        Standards for New Development

1.5.1     Compliance with Development Plan Procedures Required

All new development shall be subject to development plan review in accordance with Section 3.10 of the Cary Land Development Ordinance.

 

1.5.2     General Development Requirements

As applicable, the following general requirements shall govern development within Fryar:

 

(A)             Measurement of Acreage, Density, and Units

All acreages are preliminary until final surveying takes place during the construction drawing phase of development. Final parcel acreages may vary during final site design.  Densities for the residential parcels are considered to be maximums and the resulting number of units for each parcel may vary once final parcel acreages are established.

 

(B)             Reduction of Building Setbacks

All building setbacks shall be as specified in this document and shall not be subject to any code changes. All building setbacks may be reduced a maximum of 10% by Town of Cary staff.

 

(C)             Interior Buffers or Building Setbacks

No building or parking setbacks shall be required against buffers, portions of buffers, streetscapes and any type of open space unless existing vegetation remains.  Within non-residential parcels, there shall be no interior buffers or setbacks between separate buildings, even if under separate ownership.  Should parcels ever be added to the development, associated landscape strips will be removed.  Should a homeowner recreation site be located within the development, a 20’ Type B buffer shall be required except when adjacent to collector roads and the commercial site where 10’ Type B landscape strips will be provided.

 

(D)            Open Space Configuration and Dimensions

All types of buffers and streetscapes shall be as specified in the Open Space Definitions (see 1.3.4) and shall not be subject to any code changes.  No additional streetscapes or buffers shall be required.  The exact configuration and dimension of open space areas shall be determined at time of subdivision or site plan approval.

 

(E)             Road Improvements

Green Hope School Road improvements will be made as future adjacent phases are developed.  Morrisville Parkway right-of-way will be dedicated within the site but construction is not proposed.

 

(F)             Morrisville Parking Streetscape

The 30' Weldon Ridge Boulevard streetscape shall be sup