TOWN OF CARY, NORTH CAROLINA
 
STAFF RECOMMENDATION
 TO TOWN COUNCIL

Rezoning Petition:

04-REZ-32 Bishop’s Gate Planned Development District (PDD) Amendment

Land Use Plan Amendment:

N/A

 

Meeting

Date

Staff Recommendation

Action

Town Council Public Hearing

February 24, 2005

Forward to the April 18, 2005 Planning and Zoning Board meeting

Forwarded to the April 18, 2005 Planning and Zoning Board meeting

Planning and Zoning Board

April 18, 2005

Staff recommends approval

The Planning and Zoning Board voted 7-3 to forward the request to the Town Council with a recommendation of approval

Town Council

May 12, 2005

Staff recommends approval of the request

Town Council tabled the request until the June 9, 2005 , Town Council meeting at the applicant’s request

Town Council   June 9, 2005 Staff recommends approval of the request Town Council voted 7-0 to approve the request with the conditions stated below

 

TOWN OF CARY CASE MANAGER

Beth Lewis, Senior Planner

Phone:  (919) 462-3944
Email:  beth.lewis@townofcary.org

STAFF RECOMMENDATION

Staff recommends approval of the request.  

  • The applicant has requested an amendment to the Planned Development District (PDD) document to permit the issuance of the certificates of occupancy for all of the units within the Bishop’s Gate PDD before the extension of Westhigh Street over the railroad track that runs parallel to Davis Drive is complete.  The original PDD document limited the number of certificates of occupancy to 100 before that connection was made.  A Town Council action increased that number to 200.  The applicant now wishes the limitation to be removed completely to permit the completion of Bishop’s Gate before that connection is made.  Conversations with CSX are on-going with regard to that connection, but no time-table for a resolution has been set.  The applicant has agreed to provide a letter of credit for the construction of the extension of Westhigh Street over the railroad track.  The bond will be held until such time that a resolution has been reached, that either the road will or will not cross the track.  Therefore, staff recommends permitting the completion of Bishop’s Gate, and recommends the approval of the applicant’s request.

 

  • One of the further conditions in the PDD document required that the connection of Modena Drive into the Giverny Subdivision not be opened until at least 90 days after the railroad crossing is made.  That section of Modena Drive is complete, but is barricaded so as not to permit the flow of traffic.  The applicant has a private agreement with that neighborhood not to open the connection except under the conditions of the PDD document.  Although there is an agreement between the developer and the Giverny neighborhood concerning the timing of the opening of Modena Drive , the restriction is not binding on the Town.  When the delivery of public safety or services require, the Town will cause the gates to be removed and the road opened.

 

  • Conversations between the Town’s Engineering Department and the applicant are on-going with regard to the exact configuration of the terminus of Westhigh Street , both at this time and should the railroad crossing not be accomplished.  A resolution to the configuration of that terminus will be completed within the site plan review process.

APPLICANT

OWNERS

Withers & Ravenel, Inc
111 MacKenan Drive
Cary, NC 27511
(919) 469-3340
Fax (919) 467-6008
csmith@withersravenel.com

 

Centex Homes
2301 Sugar Bush Rd.
Suite 400
Raleigh, NC 27612  

Terry B. Witt
4001 Buckingham Way
Apex, NC 27502

   

TOWN COUNCIL 6-9-05

The Town Council voted to approve the request with the following statement added:

“The developer has no assurances from the railroad that the connection of Westhigh Street over the CSX rail line to Davis Drive will be permitted.  Therefore, the removal of the gate on Modena Drive will occur no sooner than ninety (90) days after whichever of these two occurrences happens first:

a.   The completion of the connection of Westhigh Street to Davis Drive over the railroad track; or

b.    95% of the certificates of occupancy are granted in the Bishop’s Gate Planned Development District.”  

PLANNING AND ZONING BOARD

The Planning and Zoning Board had concerns about the limited access to the site if the crossing is not made over the railroad track.  It was discussed that Bishop’s Gate has a number of other access points, one to Old London Way and several into property that has not yet sought subdivision approval.  The Board had concerns about the timing of the opening of Modena Drive and the impact that traffic may have on the Giverny neighborhood.  Some members expressed concern that permitting the final units in Bishop’s Gate and the connection to Old London Way would funnel an increased amount of traffic on Old London Way , when some of the traffic could use Modena Drive .  There were concerns about the procedure to get the extension of Westhigh Street over the railroad track should the developer in Bishop’s Gate complete all of the residences before that crossing is made.  It was explained that a letter of credit that does not expire would provide for the construction of that roadway extension.  The Board voted 7-3 to forward the request to the Town Council with a recommendation of approval.  The dissenting voters expressed that their dissenting votes were to assure that the item was not on the Town Council’s consent agenda, so that the Council would have to opportunity to discuss the request.

 

CHANGES SINCE PUBLIC HEARING

·     At the Town Council public hearing, neighbors from the Old Salem and Giverny neighborhoods spoke about the lack of alternate access to Bishop’s Gate.  Some were concerned about the opening of Modena Drive into Giverny should the crossing over the railroad track not take place. 

·     There was a protest petition filed by an adjoining neighbor concerned about access to her property should the railroad crossing not be made, but the petition was not valid because it was filed by a land owner who owned less property than is required to make the petition valid. 

·     No changes to the application were made since the public hearing.

   

LOCATION

MAPS & DOCUMENTS

Davis Drive north of Salem Church Road across from Forget Me Not Road and Farmpond Road

Town of Cary Vicinity Map

Town of Cary Zoning Map

Town of Cary Land Use Map

Bishop’s Gate PDD document

Bishop's Gate Master Plan Map

   

PROJECT DESCRIPTION

The request changes the number of units that can receive a Certificate of Occupancy before the connection of Westhigh Street to Davis Drive across the railroad tracks is completed.  It increases the number of units from 100 units to 297 units, the total number of units in the project.  The applicant has been unable to secure approval from the railroad to cross it to connect Davis Drive and Westhigh Street , but they seek to continue to construct and complete residences in Bishop’s Gate.

Parcel

Maximum Density (Du/Ac)

Acreage

Total Units

Minimum Lot Size

0743637462

0743614925

Not applicable to this request

22.48

25.21

SF-1 - 92

SF-2 – 5

SF-3 – 4

SF-4 – 41

AR-1 – 68

AR-2 – 35

AR-3 – 22

AR-4 - 30

Not applicable to this request

Total

 

47.69 acres

297 in Bishop’s Gate PDD

 

 

APPLICANT’S JUSTIFICATION STATEMENT

“We are requesting to change nothing in the Bishop’s Gate PDD other than one number, referred to in Section K on page 25, the number of allowed c.o.s prior (to) the connection of Westhigh Street and Davis Drive .  In concert with the Town, we have been seeking approval from CSX Rail for the rail crossing of Westhigh Street prior to its connection with Davis Drive .  This has proven to be a longer and more drawn out process than originally projected.  Because of specific Town of Cary transportation needs, this has also become an issue that has grown outside the scope of our PDD and has become more of a Town issue than a Bishop’s Gate issue.  We are, therefore, seeking to build out our project because of the hardship placed on the Witt property.  (By the way, we are presently allowed 200 c.o.s instead of 100, this was approved by Engineering previously.  As Section K notes, we had reserved the right to revisit the c.o. numbers because of the uncertainty of the railroad approval.)”

 

CURRENT USE & ZONING

Current Land Use:  High Density Residential (HDR) and Low Density Residential (LDR).  

The current land use of the Bishop’s Gate Planned Development District is residential.

Proposed Land Use:   No change. 

The proposed land use will remain residential.

Current Zoning: Planned Development District (PDD) Major

ADJACENT ZONING & LAND USES

 

Existing Use

Existing Zoning

Existing Land Use Designation

North:

Giverny Subdivision, single family residences

Residential 12 (R-12)

Office/Institutional (OFC/INS)

East:

Olde Salem Subdivision, single family residences

Residential 8C (R-8C)

High Density Residential (HDR), Parks (PKS), Low Density Residential (LDR)

South:

Agricultural Uses
Single family residences

In Apex Town Limits and Apex ETJ, Rural Residential (RR)

N/A

West:

Across Davis Drive , single family residences
Vacant land

In Wake County ETJ , Residential 40 W (R-40W)

Low Density Residential (LDR)

         

 

PLANNING  

Comprehensive Plan Analysis

The proposal complies with the Land Use Plan.  No amendment is required.  

Parks and Greenways

There are no parks or greenways issues related to this amendment based on the Parks, Recreation and Cultural Resources Facilities Master Plan.

Transportation Planning

Engineering staff is in discussion with the applicant regarding the design of the termination of Westhigh Street should the railroad crossing not be accomplished. Finalization of the configuration will occur at the time of site plan review. Staff has agreed to permit the Modena Drive connection condition to remain until such time that the lack of a connection at Modena creates a public safety issue. At that time, the connection will be made and all barricades will be removed.

School Information

Since this request affects a roadway connection only, school information is not applicable.

 

ENGINEERING  

Environmental Considerations

There are riparian buffers associated with this project.  The project will be required to meet the nitrogen requirements of the Town of Cary .

Utilities (Water and Sewer)

Since this request affects a roadway connection only, utility information is not applicable to this amendment.

Traffic Impact Analysis

An updated Traffic Impact Report has been prepared by the Town of Cary traffic consultant, HNTB. All intersections remain at the standard Level of Service D or better.

 

PARCEL & OWNER INFORMATION

Property Owner(s)

County Parcel Number

Real Estate ID(s)

Area (Acres)

Centex Homes

0743637462

0304700

22.48

Terry B. Witt

0743614925

0240189

25.21

Total Acreage

 

 

47.69