TOWN OF CARY
REQUEST FOR REZONING/PLANNED UNIT DEVELOPMENT/ LAND USE PLAN AMENDMENT
PLANNING AND ZONING BOARD (October 20, 2003)
03-REZ-08 6750 TRYON ROAD
| Staff Contact: |
Randy Guthrie, Principal Planner (919) 462-3942 Randy.guthrie@townofcary.org |
|
PETITIONER |
PROJECT CONTACT |
PROPERTY OWNER |
|
Harvest Davalland, LLC 6750 Tryon Road Cary, NC 27511 (919) 836-4840 Fax: (919) 851-1918 bhood@mulkeyinc.com |
Bill Hood
Harvest Davalland, LLC 6750 Tryon Road Cary, NC 27511 (919) 836-4840 Fax: (919) 851-1918 bhood@mulkeyinc.com |
Harvest Davalland,
LLC
6750 Tryon Road Cary, NC 27511 (919) 836-4840 Fax: (919) 851-1918 bhood@mulkeyinc.com |
|
LOCATION: |
6750 Tryon Road (Intersection of Tryon Rd. and Frostwood Dr.) |
|
MAPS: |
Vicinity Map - Small Vicinity Map - Large Zoning Map Land Use Plan Map Stream Buffers Open Space Map |
In
Town Limits [X]
Inside
|
PROPOSED
SCHEDULE OF MEETINGS |
|
|
TOWN COUNCIL PUBLIC HEARING: |
|
|
PLANNING & ZONING BOARD and PUBLIC HEARING: |
|
|
TOWN COUNCIL: |
|
|
PARCEL
INFORMATION |
||
|
Parcel
# |
Realid
# |
Area |
|
076212851222 |
7.76 (calc)
7.847 (deeded) |
|
|
REZONING
DATA |
||||
|
|
CURRENT |
PROPOSED |
||
|
UDO |
LDO |
UDO |
LDO |
|
|
Zoning: |
O&I
– CU |
O&I
– CU |
O&I
– CU |
O&I
- CU |
|
Overlay District: |
Swift
Creek Watershed |
Swift
Creek Watershed |
||
|
Land Use: |
OFC/INS |
OFFC |
||
|
OVERVIEW
OF REQUEST |
|
This property is in an
O&I CU district and the applicant requests two of the previous
conditions changed. Change 1. Building setbacks of at least 90 feet will
be applied to the east boundary of Parcel B ( |
|
APPLICANT’S
JUSTIFICATION STATEMENT |
|
Our engineering firm (Mulkey
Inc) has continued to be very successful in the two years we have occupied
the existing building, to the point where we will very soon need
additional office space to accommodate expanding our business. In
reviewing our options to add on to the existing building or build a new
building on the vacant lot next door, it became apparent that expanding
the existing building was by far the preferred choice.
Not only is it much more efficient for our operations to be in one
building as opposed to two, but by expanding the existing building we can
better deal with recurring maintenance issues that currently exist with
the existing structure relative to high groundwater.
However, with the existing limitation on square footage, any
expansion of the existing building will reduce the potential of a
reasonable development solution on the adjacent vacant lot (Lot B) We have proposed a
compromise to our neighbors in meetings on Changing to a one story
structure and eliminating the parking opportunity on the east side of the
property (as desired by the adjacent property owner to the east) will
require the building itself to be shifted slightly east on the property. This request for revision
will require more stringent restrictions than the base zoning would allow
for the property. All other
remaining conditions will remain on the property. |
|
REZONING
CONDITIONS |
|
CURRENT
|
PROPOSED
|
|
1.
Any new
buildings would be architecturally compatible with the existing church
building and be residential in character. ·
Buildings would be primarily brick, similar in appearance
and quality to the existing church building and the residential structures
on surrounding lots. ·
All roofs would be pitched (residential in character).
Asphalt shingle roof material will closely match the existing building. 2.
Relative to Parcel B, 40-foot Type A buffers will be applied
to 3.
The existing gravel parking lot (on Lot B) will be grassed
upon church's vacating the property. Topsoil
will be spread over the entire lot and a grass lawn established. 4.
Light pole height will be limited to 20 feet.
Also, shoebox type light fixtures will be used to add
attractiveness to the site and limit spillover lighting.
Lot B lighting will be removed upon church vacating property. 5.
Building height will not exceed 36 feet from finished grade
to mean height between eaves and peak. 6.
Access to Parcel B from 7.
The total number of buildings on the entire site (parcels A
& B) shall be limited to two buildings (including the existing
building) with a maximum square footage for the entire site (parcels A
& B) shall be limited to 35,000 square feet. This 35,000 square foot
limitation applies to the existing building (June 1999) as well as any
additional building 8.
The following uses will be removed as permitted uses under
the conditional rezoning: ·
Child day care centers ·
Parking lots, as the principal use of the property ·
Funeral homes ·
Public utility facilities ·
Utility substations ·
Communications, radio, TV microwave or other
telecommunications towers. ·
Outdoor amphitheater, government ·
Package delivery/messenger services ·
Kennels indoor/outdoor (outdoor walking, exercising,
training, etc.) ·
Hospitals ·
Nightclubs and bars ·
Farm market ·
Banks ·
Restaurants 9.
The property owner or the assignee shall complete the
required thoroughfare plan improvements to 10.
A traffic impact analysis report as per the Interim Planned
Development Ordinance provisions will be required with the initial site
plan application for the subject property. 11.
Dumpster and pads will be screened with material matching
the building exterior. 12.
No temporary or permanent mobile trailers will be allowed
(construction trailers not included). 13.
Existing on-site trailers will be removed upon church
vacating property. |
1.
Any new
buildings would be architecturally compatible with the existing church
building and be residential in character. ·
Buildings would be primarily brick, similar in appearance
and quality to the existing church building and the residential structures
on surrounding lots. ·
All roofs would be pitched (residential in character).
Asphalt shingle roof material will closely match the existing building.
3.
The existing gravel parking lot (on Lot B) will be grassed
upon church's vacating the property. Topsoil
will be spread over the entire lot and a grass lawn established. 4.
Light pole height will be limited to 20 feet.
Also, shoebox type light fixtures will be used to add
attractiveness to the site and limit spillover lighting.
Lot B lighting will be removed upon church vacating property. 5.
Building height will not exceed 36 feet from finished grade
to mean height between eaves and peak. 6.
Access to Parcel B from 7.
The total number of buildings on the entire site (parcels A
& B) shall be limited to two buildings (including the existing
building) with a maximum square footage for the entire site (parcels A
& B) shall be limited to 8.
The following uses will be removed as permitted uses under
the conditional rezoning: ·
Child day care centers ·
Parking lots, as the principal use of the property ·
Funeral homes ·
Public utility facilities ·
Utility substations ·
Communications, radio, TV microwave or other
telecommunications towers. ·
Outdoor amphitheater, government ·
Package delivery/messenger services ·
Kennels indoor/outdoor (outdoor walking, exercising,
training, etc.) ·
Hospitals ·
Nightclubs and bars ·
Farm market ·
Banks ·
Restaurants 14.
The property owner or the assignee shall complete the
required thoroughfare plan improvements to 15.
A traffic impact analysis report as per the Interim Planned
Development Ordinance provisions will be required with the initial site
plan application for the subject property. 16.
Dumpster and pads will be screened with material matching
the building exterior. 17.
No temporary or permanent mobile trailers will be allowed
(construction trailers not included). 18.
Existing on-site trailers will be removed upon church
vacating property. |
|
REZONING
HISTORY |
|
SITE
DATA |
|
WATER/SEWER
SERVICE |
|
Staff
Remarks: This
property has direct access to a Town of Analysis:
The proposed rezoning will not have noticeable impact to Town of |
|
TRANSPORTATION |
|
Traffic Impact Analysis
Required: Yes
[ ]
No [ x ] |
|
An
office building of 55,000 sq.ft. does not require a traffic study. AM
Peak
86 trips PM
Peak
82 trips ADT
606 trips A
Traffic Impact Analysis was prepared by HNTB November 2000 per condition
15. Analysis:
Does not require a traffic impact study. |
|
ENVIRONMENTAL
CONSIDERATIONS |
|
The
project is located in the Swift Creek Watershed and will have to meet the
requirement of the Reservoir Watershed Protection Ordinance of the Town of
There
are riparian buffers associated with this project that will need to be
investigated. The
project will be required to meet the nitrogen requirements of the Town of Analysis:
This project meets all of the requirements of the Stormwater
section of the Engineering Department. |
|
ADJACENT
ZONING AND LAND USES |
|||
|
|
Zoning: |
Land
Use: |
|
|
|
UDO |
LDO |
|
|
North: |
R-30 |
R-40 |
LDR |
|
South: |
R-30 |
R-40 |
LDR |
|
East: |
R-30 |
R-40 |
LDR |
|
West: |
R-30
C |
R-12 |
LDR |
|
|
|
|
|
|
TOWN
OF |
||
|
|
|
|
|
|
CURRENT |
PROPOSED |
|
Plan Designation: |
OFC/INS |
No
change |
|
Alternate Designation: |
none |
none |
|
|
none |
none |
|
COMPREHENSIVE
PLAN ANALYSIS |
Land
Use Plan Element
LAND USE PLAN AMENDMENT
HISTORY: None. Analysis: The rezoning
request does not require an amendment to the Land Use Plan. |
|
TRANSPORTATION
PLANNING |
|
Transit: The
Town's transit service (C-Tran) can provide service to the subject area.
C-Tran is a demand responsive transit service managed by the Town
to provide bus transit to residents, visitors and businesses in Pedestrian:
Sidewalk is required on both sides of thoroughfares.
The Town’s Bicycle:
Fourteen foot wide outside lanes are required on thoroughfares to
accommodate bicycle traffic. The
Town’s Transportation Plan
Element: The Town’s Transportation Plan designates **Estimated construction
start for the Town’s Analysis: No comment. |
|
OPEN
SPACE CONSIDERATIONS |
|
Analysis:
There are no significant resources on the parcel. |
PARKS, GREENWAYS AND
BIKEWAYS MASTER PLAN
|
|
No comments Analysis: No comment |
Staff Recommendation
|
Changes since Public Hearing:
None Protest Petition
Information: This request changes the
zoning conditions associated with the 1998 conditional use rezoning by
reducing the 120 foot setback on the eastern boundary of parcel B to 90
feet and not allowing any parking on the eastern side of the new building.
This request also proposes to
increase the allowable building square footage from 35,000 square feet to
55,000 square feet. Any new
structures will be limited to one story.
These changes do not impact the land use plan or have a negative
impact on traffic for the area. Pros:
Revised zoning conditions do not allow parking in between the new
building and Cons:
None |
STAFF RECOMMENDATION:
|
|
Staff recommends approval |
PLANNING AND ZONING BOARD RECOMMENDATION:
|
|
To be determined after
Planning and Zoning Board Meeting. |
|
Information
regarding this rezoning case will be on the Internet one week prior to the
public hearing. Our
Internet address for this case is http://www.townofcary.org/depts/dsdept/P&Z/rezonings/2003cases/2003index.htm |