TOWN OF CARY
REQUEST FOR REZONING/PLANNED UNIT DEVELOPMENT
TOWN COUNCIL IMPACT STATEMENT (May 8, 2003)
02-REZ-27 Cameron Pond Planned Unit Development
| Staff Contact: |
Suzanne Prince, Senior Planner (919) 462-3944 sprince@ci.cary.nc.us |
|
PETITIONER |
PROJECT CONTACT |
PROPERTY OWNER |
|
Jerry Turner & Associates 905 Jones Franklin Road Raleigh, NC 27606 Phone: 851-7150 Fax: 851-7547
|
Same as Petitioner |
Cameron Pond Associates ETD 2515 Fairview Road Raleigh, NC 27609 William & Mary Welch, Sr. 7205 Carpenter Fire Station Road Morrisville, NC 27609 John Larkin Smith, Sr. 7437 Carpenter Fire Station Road Morrisville, NC 27560 Andrew R. Jones 112 Winsome Lane Chapel Hill, NC 27516 |
|
LOCATION: |
West of Highway 55, east of Green Level to Durham Road, both north and south of Carpenter Fire Station Road |
|
MAPS: |
In Town Limits [X - portion] Inside Cary ETJ [ ] Outside Cary ETJ [ ] Annexation Pending [X - portion]
|
PROPOSED SCHEDULE OF MEETINGS |
|
|
TOWN COUNCIL PUBLIC HEARING: |
January 23, 2003 |
|
PLANNING & ZONING BOARD: |
March 17, 2003 (continued to the April 21, 2003 PZ Board Meeting) |
|
TOWN COUNCIL: |
May 8, 2003 |
|
PARCEL INFORMATION |
||
|
Parcel # |
Realid # |
Area |
|
0735238344 |
0170658 |
77.46 |
|
0735349428 |
0119009 |
2.99 |
|
0735153095 (part of) |
0232336 |
35.05 |
|
0735241275 |
0065138 |
6.66 |
|
0735445085 |
0273865 |
20.95 |
|
Total Approximate Acreage: 143.1 Acres |
||
|
REZONING DATA |
||
|
CURRENT |
PROPOSED |
|
|
Zoning: |
Residential Mixed Conditional Use (RMCU), and Residential 40 (R40) |
Residential Mixed Planned Unit Development (RMPUD) |
|
Overlay District: |
Jordan Lake Watershed |
same |
|
Land Use: |
PIN 0735349428 contains a single-family residence, the remainder of the property is vacant. |
A Planned Unit Development consisting of a mix of single family and multi-family residences and a park, totaling 417 units. |
|
REZONING SUMMARY |
|
|
CURRENT |
PROPOSED |
|
PIN 0735238344 currently carries the following conditions:
|
Single Family residential SF-1 118 units, 41.12 acres, all single family detached dwellings.
SF2 and SF-3 84 units, 24.42 acres, unit types may include single-family detached dwellings, patio homes, zero lot line homes, townhomes.
Multi-family residential MF-1 215 units, 23.88 acres, unit types may include cluster homes, patio homes, zero lot line homes, townhomes, or other multi-family units.
Neighborhood Recreation Site: ~ 3 acres as part of SF-2 Town Park: 16.29 acres Total units: 417 |
|
Conditions:
Here are some provisions that will be used to protect trees as the development proceeds. Deed Restrictions on the Rear Setbacks Lots containing slopes of 25% or greater will have a deed restriction requiring the rear 30 feet to be preserved except for utilities, stormwater facilities and roadways. Streetscapes may be reduced to no less than 20 feet to aid in the protection of natural vegetation on the site. Statement made to the builders in regard to clear cutting Clear cutting of the existing SF-1, SF-2 and SF-3 wooded lots is prohibited by the Developer of Cameron Pond. Each builder will be required to obtain developer approval prior to the start of construction. The expected clearing limits used would be to remove any trees within 15 of the sides of the foundation 20 in the front and 30 in the rear unless said limits encroach into buffers or deed restricted areas. The main intent would be to accommodate the future house, driveway, provide an adequate backyard, and provide proper drainage. Clearing additional trees would be discouraged in the architectural review process and would only reduce the market value of the finished home. The party that will grant final approval to the individual homebuilders is the overall subdivision developer. Architectural Review Process The builders are required to obtain architectural review prior to the start of construction. The review includes a review of the house placement on the lot as shown on the plot plan. Builders by contract must agree to this process and are subject to fines if they do not do so. The party that will grant final approval to the individual homebuilders is the overall subdivision developer. Neighborhood Protective Covenants The protective covenants can address and require the final homeowner to obtain approval prior to removing any trees from their lot. Should they remove trees without permission they will be fined and subject to strict replanting requirements.
Bolded conditions added 4/17/03 |
|
REZONING HISTORY |
|
PIN 0735238344 was rezoned from Residential 40 (R40) to Residential Mixed Conditional Use (RMCU) through 97-REZ-23, June 26, 1997. The rest of the parcels have no rezoning history. |
|
SITE DATA |
|
WATER/SEWER SERVICE |
|
According to the proposed utility plan, the PUD will have public water service by connecting to the existing 16" waterline along Carpenter Fire Station Road. Gravity sewer to the proposed development south of Carpenter Fire Station Road will connect to the existing Panther Creek Branch Interceptor. Off-site sewer easement and sewer installation is needed for this connection. The proposed development north of Carpenter Fire Station Road will have gravity sewer service by a sewer connection to the Morris Branch Interceptor, which is currently under design. Analysis: The proposed development has adequate access to Town of Cary public water distribution system. Sanitary sewer service will not be available until downstream infrastructure is in place. Staff does not object rezoning of this project. However, without sanitary sewer service, site plans for this development will not be approved. This development will be required to comply with all Town of Cary utility policies and standards. |
|
TRANSPORTATION |
|
Traffic Impact Analysis Required: Yes [ x ] No [ ] |
|
Comprehensive Transportation Plan Requirements: Carpenter Fire Station Road ΰ ultimate 4 lane median divided cross section with wide outside lanes to accommodate bicycles New north-south collector required within the site ΰ ultimate 2-3 lane cross section. (2-lanes with landscaped median are the preferred option, as recommended in the Northwest Cary Area Plan.) Analysis: Refer to "Transportation Planning Analysis". No additional comments. |
CAMERON POND PUD EXECUTIVE SUMMARY
Wilbur Smith Associates December 2002
This study has been conducted to assess the traffic impacts and evaluate the access and egress requirements for the proposed Cameron Pond Planned Unit Development (PUD). The project site is to be located in the northwestern portion of Cary, North Carolina. This report identifies the impact of traffic generated by the proposed development and evaluates it with regard to capacity, safety, and roadway requirements. The following provides a brief summary of this studys findings.
PROJECT DESCRIPTION
The project proposal is a residential development known as the Cameron Pond PUD. This project site is to be located along Carpenter Fire Station Road, between Cary Glen Boulevard and NC 55, and is just to the northeast of the previously approved Cary Park PUD. As proposed, 195 multi-family townhome/condominium units and 200 single-family units will be constructed on-site for a development total of 395 units. Under the current development plan, all units would be constructed and occupied by 2007.
Access for this future development will be provided via three full movement access driveways which will all directly access Carpenter Fire Station Road.
It should be noted that future regional access to the project will also be provided by the planned Western Wake Expressway, which is proposed to be constructed by the NCDOT in the immediate area of the site. When constructed, this future Expressway would provide excellent regional access for traffic generated by the Cameron Pond PUD. For study purposes, the Western Wake Expressway has not been assumed to be in place by the planning horizon of the project.
EXISTING CONDITIONS
Existing conditions have been gathered for the following five intersections, which make up the project study area as directed by Town of Cary staff:
This study area is located within the Northwest Transportation Zone, which requires that peak-hour volumes utilize a 90-minute average peak in accordance with the Towns APFR Ordinance 01-012. Traffic volume data within the study area has been obtained for the weekday AM (6:30 - 9:30 AM) and PM (3:30 - 6:30 PM) peak periods. From this data, peak-hour multipliers of .966 and .947 were developed for the AM and PM peaks, respectively, and have been utilized within this report as required by the ordinance.
PROBABLE IMPACTS OF THE PROJECT
No-Build Traffic Volumes
To represent Future 2007 traffic volume conditions within the study area, the Existing traffic flow volumes were upwardly adjusted to account for normal traffic growth and any other currently approved projects within the study area.
Discussions with Town of Cary staff indicate that an annual growth rate of 5 percent per year is to be used for traffic on NC 55 and 10 percent per year for all other volumes. These growth rates were applied to the Existing peak-hour traffic volumes to estimate Future 2007 conditions without the proposed development. It should be noted that, in addition to the normal annual growth in traffic, one-half of the projected traffic associated with the Cary Park and Amberly PUDs has been included in the 2007 No-Build traffic volumes.
Planned Roadway Improvements
Within the defined study area, NC 55 is programmed to be widened from its current two-lane cross-section, to a four-lane divided facility by the NCDOT. Along with the proposed widening, the signalization of the NC 55/Carpenter Fire Station Road and NC 55/Morrisville Carpenter Road intersections is expected with the addition of applicable turning lanes. This improvement is planned to begin by 2003/2004, and will extend from US 64 through the study area to I 40.
As part of the Amberly PUD and Cary Park PUD projects, two roadway projects are anticipated to be constructed within the Cameron Pond PUD study area. Panther Creek Parkway will be constructed as a two-lane facility from Green Level to Durham Road to NC 55, opposite McCrimmon Parkway. Also, Cary Glen Boulevard will be extended as a two-lane facility from its current terminus at Carpenter Fire Station Road northward to intersect with the above-cited Panther Creek Parkway. With these projects, signalization is anticipated at the Green Level to Durham Road/Cary Glen Boulevard, Green Level to Durham Road/Panther Creek Parkway, Green Level to Durham Road/Carpenter Fire Station Road, and Carpenter Fire Station Road/Cary Glen Boulevard intersections with the addition of applicable turning lanes.
Another planned roadway project is the Wake Expressway, which is planned to end at NC 55 via a grade-separated interchange. South of NC 55, the Wake Expressway should, at a minimum, continue as a two-lane facility terminating at Panther Creek Parkway (proposed) via an at-grade intersection. Right-of-way acquisition for this project is expected to begin in 2006, with construction anticipated to begin in 2008 and end in 2010. For the purposes of this study, neither the Western Wake Expressway nor its extension to Panther Creek Parkway has been considered due to its expected completion date.
Site-Generated Traffic
For this project, the Institute of Transportation Engineers (ITE) Trip Generation manual was utilized to estimate project trips generated by the proposed facility.
Based on this information, the proposed development can be expected to generate a total of 3,130 (two-way) vehicle trips on a weekday daily basis, of which a total of 238 trips (53 entering, 185 exiting) are expected during the weekday AM peak-hour. During the PM peak-hour, 310 trips (202 entering, 108 exiting) can be expected.
Traffic generated by the site will be primarily distributed to and from NC 55 and Green Level to Durham Road.
Traffic Volumes Increases
As a result of this project, traffic volume increases at the study area intersections are expected to be very minor, with a high of approximately six- percent.
TRAFFIC OPERATIONS ANALYSIS
The Northwest Transportation Zone requires a minimum Level-of-Service standard of a D based on the 90-minute average peak.
Under existing conditions, traffic operations at all study area intersections are acceptable (LOS D or better) during both the weekday AM and PM peak hours with the exception of the two NC 55 intersections, which operate very poorly during both time periods due to the high volume of through traffic on NC 55.
Under 2007 No-Build conditions, which account for annual growth, the Cary Park and Amberly PUDs, and all previously cited roadway improvements, all of the seven study area intersections (two are future intersections) are anticipated to demonstrate acceptable operations.
With the addition of project related traffic, operations are insignificantly affected and all seven study area intersections are anticipated to remain at acceptable levels.
recommended mitigation
The final phase of the analysis process is to identify mitigating measures, which may either minimize the impact of the project on the transportation system or tend to alleviate poor service levels not caused by the project. Measures considered necessary to mitigate roadway system deficiencies are discussed below as they relate to the impacts of the proposed project.
Proposed Site Access
As part of the proposed development plan, access to/from the proposed Cameron Pond PUD will be provided via three access driveways along Carpenter Fire Station Road. Based on the anticipated traffic volumes, the following geometrics and traffic control are suggested for each access point:
Carpenter Fire Station Road at Western Driveway
Carpenter Fire Station Road at Middle Driveway
Carpenter Fire Station Road at Eastern Driveway
With the above-cited geometrics and traffic control in place, the site driveway intersection are all anticipated to operate at a Level-of-Service F under 2007 Build Conditions during one or more of the studied time periods. This can be primarily attributed to the high volume traffic anticipated on Carpenter Fire Station Road coupled with its limited roadway cross-section.
Based on the fact that the calculated delays are not unreasonable, with the exception of possibly the western access during the PM peak-hour (delay = 153.3 seconds), coupled with the fact that recent studies in this area have shown that actual field conditions may be somewhat better than those calculated, no further mitigation is suggested for these site access driveways. All necessary turning lanes have been provided for, and future traffic volumes are not anticipated to meet signal warrants. If further mitigation is required, it is suggested that the possibility of widening Carpenter Fire Station Road, limiting movements at one or more driveways, and the possibility of combining driveways (such that signal warrants may be satisfied) should be considered.
Off-Site
Review of the intersection analyses indicates that the proposed project has a small impact on the study area intersections as compared to future 2007 No-Build conditions. Project traffic causes a minor increase in delay and V/C ratio, but does not cause any study area intersection to operate unacceptably during either the AM or PM peak-hour. Based on these conducted analyses, no improvements/modifications are necessary at any off-site study area intersection due to the anticipation that each will operate acceptably under future 2007 Build conditions.
|
Existing |
2007 No-Build |
2007 Build |
|||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||
|
Signalized Intersections1 |
Time Period |
V/Ca |
Delayb |
LOSc |
V/C |
Delay |
LOS |
V/C |
Delay |
LOS |
|||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||
|
NC 55 at |
AM |
0.8 |
17.7 |
B |
### |
21.8 |
C |
|
|||||||||||||||||||||||
|
Carpenter Fire Station Road |
PM |
0.96 |
47.2 |
D |
### |
52.5 |
D |
|
|||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||
|
NC 55 at |
AM |
0.9 |
22.0 |
C |
### |
23.0 |
C |
|
|||||||||||||||||||||||
|
Morrisville Carpenter Road |
PM |
0.93 |
18.5 |
B |
### |
19.9 |
B |
|
|||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||
|
Panther Creek Parkway at |
AM |
- |
- |
- |
0.8 |
19.1 |
B |
### |
20.4 |
C |
|
||||||||||||||||||||
|
Green Level to Durham Road |
PM |
- |
- |
- |
0.77 |
20.2 |
C |
### |
21.4 |
C |
|
||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||
|
Green Level to Durham Road at |
AM |
0.5 |
14.4 |
B |
0.5 |
14.7 |
B |
|
|||||||||||||||||||||||
|
Carpenter Fire Station |
PM |
0.51 |
11.6 |
B |
0.5 |
11.7 |
B |
|
|||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||
|
Green Level to Durham Road at |
AM |
0.3 |
10.5 |
B |
0.3 |
10.5 |
B |
|
|||||||||||||||||||||||
|
Cary Glen Boulevard |
PM |
0.4 |
11.7 |
B |
### |
11.8 |
B |
|
|||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||
|
Carpenter Fire Station Road at |
AM |
0.6 |
14.9 |
B |
0.6 |
14.9 |
B |
|
|||||||||||||||||||||||
|
Cary Glen Boulevard |
PM |
0.65 |
16.8 |
B |
### |
18.9 |
B |
|
|||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||
|
Unsignalized Intersections2 |
Delay |
LOS |
Delay |
LOS |
Delay |
LOS |
|||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||
|
NC 55 at |
AM |
* |
F |
|
|||||||||||||||||||||||||||
|
Carpenter Fire Station Road |
PM |
* |
F |
|
|||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||
|
NC 55 at |
AM |
* |
F |
|
|||||||||||||||||||||||||||
|
Morrisville Carpenter Road |
PM |
* |
F |
|
|||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||
|
Green Level to Durham Road at |
AM |
### |
B |
|
|||||||||||||||||||||||||||
|
Carpenter Fire Station |
PM |
11 |
B |
|
|||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||
|
Green Level to Durham Road at |
AM |
9.9 |
A |
|
|||||||||||||||||||||||||||
|
Cary Glen Boulevard |
PM |
### |
B |
|
|||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||
|
Carpenter Fire Station Road at | |||||||||||||||||||||||||||||||