TOWN OF CARY
REQUEST FOR REZONING
PUBLIC HEARING DATA SHEET (February 28, 2002)
02-REZ-01
Reedy Creek Shopping Center (Northwoods PUD Amendment)

PETITIONER

PROPERTY OWNER

Elam Todd d’Ambrosi, PA
Attention: Pat Mallett
Urban Planners and Landscape Architects
2601 Weston Parkway, Suite 203
Cary, NC 27513

919/678-1071
Fax: 919/678-1290
E-mail: pmallett@etdpa.com

The Barnhill Company
PO Box 1529
Tarboro, NC 27886

LOCATION:

950 NE Maynard Road

MAPS:

Vicinity Map - Small

Vicinity Map - Large

Zoning Map

Aerial Map

Land Use Plan Map

Stream Buffers

Open Space

In Town Limits [X] Cary Planning Jurisdiction (ETJ) Only [ ] Annexation Pending [ ]

PROPOSED SCHEDULE OF MEETINGS

TOWN COUNCIL PUBLIC HEARING:

February 28, 2002

PLANNING & ZONING BOARD:

April 15, 2002

TOWN COUNCIL:

May 9, 2002

 

PARCEL INFORMATION

Parcel #

Realid #

Area

076412869358

0174054

-/+ 1.93 acres

 

REZONING DATA

 

CURRENT

PROPOSED

Zoning:

Office & Institutional Planned Unit Development (O&I PUD)

Business-2 Commercial Planned Unit Development (B-2 PUD)

Overlay District:

N/A

N/A

Land Use:

Vacant

Commercial

 

REZONING CONDITIONS

CURRENT

PROPOSED

N/A

1. Office and Retail uses shall be limited to no more than 12,000 sq.ft. No single building shall exceed 9,000 sq. ft.

 

2. The following uses shall be prohibited: hotels/motels; amusement establishments; vehicle sales; radio and television broadcasting studios; animal hospitals; clubs and lodges; commercial outdoor recreation; outdoor amphitheater (gov.); nightclubs and bars; communication towers; kennels (all types); schools; nursing homes; package delivery/messenger services; wholesale, warehouse, distribution (greater than 50%); and sexually oriented businesses.

 

REZONING HISTORY

Residential to Planned Unit Development, Approved 4/22/82

Planned Unit Development Amendment, Approved 8/27/87

 

SITE DATA

WATER/SEWER SERVICE

Staff Remarks: The proposed development has access to public water on Maynard Road and on Reedy Creek Rd. Gravity sewer serving this property is possible by tying to an existing sewer located at the rear of Reedy Creek Plaza. Off-site sewer easement will be required.

TRANSPORTATION

Traffic Impact Analysis Required: Yes [x] No [ ]

Thoroughfare Plan Requirements:

Street improvements will be required along the property frontage in conjunction with site development.

1.) NE Maynard Road – designated to have an ultimate six lane median divided cross section (102’ back-to-back centered within 124’ right-of-way).

2.) Reedy Creek Road – designated as a collector street (45’ back-to-back centered within 67’ right-of-way)

Traffic Impact Study prepared by HNTB dated December 2001.

EXECUTIVE SUMMARY

I. PROJECT DESCRIPTION

The Barnhill Company is proposing to construct a new commercial development in Cary, NC. The proposed facilities will consist of a 4,000 square foot (SF) drive-in bank with three teller windows and a 4,500 SF fast food restaurant with a single drive-through window. Figure 1 shows the general location of the planned commercial development. The proposed site is located near the intersection of NE Maynard Road and Reedy Creek Road (North) in the northeastern quadrant of Cary. The proposed development is anticipated to be complete by 2003. This report analyzes the full build-out scenario for the year 2003, the no-build scenario for 2003, as well as the 2001 existing year traffic conditions. The proposed uses for this site are for traffic analysis only. This site has other development options available for office and commercial uses as outlined in the rezoning conditions on Page 1.

The proposed site will utilize existing Reedy Creek Plaza driveway access connections to NE Maynard Road and Reedy Creek Road (South). Both driveways include no turning restrictions onto either roadway. Both driveways currently service Reedy Creek Plaza, which features several commercial developments including a Food Lion grocery store.

This report analyzes and presents the traffic impacts that the Barnhill Company development will have on the following intersections:

  1. EXISTING CONDITIONS
  2. All of the analyzed intersections are existing, including the North and South Plaza Driveway connections to NE Maynard Road and Reedy Creek Road. The intersections of NE Maynard Road / Reedy Creek Road (North) and NE Maynard Road / Chapel Hill Road are currently signalized. The remaining two intersections, NE Maynard Road / Reedy Creek Road (South) and Reedy Creek Road (South) / South Plaza Driveway, are unsignalized. Reedy Creek Road (North and South) operates as a local collector facility that provides linkage to Harrison Avenue to the north and Chapel Hill Road to the south. NE Maynard Road serves as a major circulatory arterial providing access to multiple residential and commercial areas throughout the Town of Cary. The site driveways act as access for the Reedy Creek Plaza developments. Currently the site property is undeveloped and is located adjacent to Reedy Creek Plaza. The land surrounding the study area is primarily used for commercial and residential development.

     

  3. PROBABLE IMPACTS OF THE DEVELOPMENT PROJECT
  4. The addition of new peak hour trips during the AM peak period and the PM peak period could cause potential site traffic impacts to the study area intersections. The intersection of NE Maynard Road / Chapel Hill Road currently experiences high traffic volume for both peak periods, and has many movements that experience lengthy delay. The addition of site traffic could force some traffic movements over capacity at this intersection and may cause operational problems in the future. These impacts will be mitigated somewhat by the Town of Cary Chapel Hill Road widening project. Traffic operations at site driveways could present a problem for left-turning vehicles due to moderate to heavy traffic flows on both NE Maynard Road.

  5. TRAFFIC OPERATIONS ANALYSIS

With the addition of peak hour site generated trips to the projected 2003 background traffic volumes during the AM and PM peak periods, no intersection will experience overall deficient traffic operations. The intersection of NE Maynard Road / Chapel Hill Road operates over capacity in the AM peak hour currently, but conditions significantly improve with the added capacity provided by the Chapel Hill Road widening project. This project, based on conversations with Town staff is scheduled to be complete by site build-out and is included in the analysis. Operations at the stop-controlled site driveways will also be acceptable for all conditions. Nearby upstream signals will aid in providing adequate gaps for traffic turning into and out of the proposed site and existing Reedy Creek Plaza.

A summary of the traffic operations for each intersection, related to vehicular delays (intersection average as a whole if signalized, critical movement if stop-controlled) and Level-of-Service (LOS) is shown in Table ES-1 below.

Table ES-1 LOS and Delay Summary

Barnhill Development – TAR 128

2001 Existing

2003 No-Build

2003 Build

2003 Mitigated

Intersections

Time Period

Delay

LOS

Delay

LOS

Delay

LOS

Delay

LOS

NE Maynard Road at

AM

7.8

A

8.4

A

8.4

A

N/A

N/A

Reedy Creek Road (North)

PM

12.8

B

15.7

B

19.9

B

N/A

N/A

NE Maynard Road at

AM

17.4

C

18.7

C

20.8

C

N/A

N/A

Reedy Creek Road (South)

PM

19.0

C

20.6

C

31.9

D

N/A

N/A

Reedy Creek Rd (South) at

AM

10.1

B

10.2

B

10.7

B

N/A

N/A

South Plaza Driveway

PM

10.1

B

10.2

B

11.1

B

N/A

N/A

NE Maynard Road at

AM

64.9

E

28.9

C

30.1

C

N/A

N/A

Chapel Hill Road

PM

54.1

D

28.2

C

29.5

C

N/A

N/A

N/A – Not Applicable or No Improvements Necessary

           

V. MITIGATION RELATED TO THE PROJECT

In summary, there are no recommended improvements within the study area specifically caused by site traffic impacts in Condition 3 (year 2003 traffic with site). All signalized and unsignalized intersections operate at congestion levels that are less than Town-mandated standards. With all intersections operating acceptably, no improvements, warranted or otherwise, will need to be completed by the site buildout year of 2003.

ENVIRONMENTAL CONSIDERATIONS

The project will be required to address the Nitrogen Removal Ordinance of the Town of Cary

ADJACENT ZONING AND LAND USES

 

Zoning:

Land Use:

North:

Office/Institutional PUD

Vacant Land
Reedy Creek Road

South:

Residential-8

Business-2 PUD

Willoughby Place Subdivision
Vacant Land
Reedy Creek Road

East:

Office/Institutional PUD

Vacant Land
NE Maynard Road

West:

Business-2 PUD

Reedy Creek Plaza

 

TOWN OF CARY FUTURE LAND USE PLAN DATA

 

CURRENT

PROPOSED

Plan Designation:

Office Institutional

Commercial

Alternate Designation:

Medium Density Residential

None

Activity Center:

Neighborhood Activity Center

No Change

 

LAND USE PLAN AMENDMENT HISTORY

In this case no land use amendment is required as the proposal lies within the focus area of an existing neighborhood activity center, where commercial uses of a type which support the neighborhood can be permitted. Total retail floorspace of a neighborhood activity center may typically fall within a range of 50,000 to 100,000 square feet.

 

OPEN SPACE CONSIDERATIONS

No impact on existing or potential open space resources.

 

PARKS, GREENWAYS AND BIKEWAYS MASTER PLAN

There are no proposed greenways within the development area.

 

Information regarding this rezoning case will be on the Internet one week prior to the public hearing. Our Internet address for this case is http://www.townofcary.org/depts/dsdept/P&Z/rezonings/2002cases/2002index.htm.