| Approval Date | Project Name | Project Number | Street Name | Proposed Use Comments | Applicant Name | Applicant Phone Number | Acreage | Building Sq. Ft. | Number of Bldgs | |
| 07/28/2008 | 116 Gregory Drive Subdivision | 08-SB-006 | Gregory Drive | subdividing lot | Renwick Lee Tart | (919) 771-4479 | 0.47 | 0 | 0 | |
| 07/28/2008 | Mills Park Middle School | 08-SP-021 | Mills Park Dr | 196,578sf middle school | McNeely Associates, PA | (919) 782-9677 | 53.7 | 196,578 | 1 | |
| 07/28/2008 | Prestwyck Subdivision Entry Features | 07-SB-010-A | Stephens Road | entry feature | D'Amato Design Associates | (919) 786-0040 | 0 | 0 | ||
| 07/28/2008 | SAS/C Conference Center Revisions | 05-SP-133-A | SAS Campus Drive | increase in gross square footage (10,232sf) & parking (180 spaces) | George Finch/Boney & Assoc. | (919) 833-1212 | 10,232 | 0 | ||
| 07/28/2008 | Scandariato Office Revisions | 07-SP-129-A | S. Harrison Avenue | relocate handicap parking space & changes to windows & doors | 2SL Design Build, Inc. | (919) 833-1448 | 0 | 0 | ||
| 07/24/2008 | Kilmayne Office Park | 07-MU-006 | Kilmayne Drive | Office Park | Jerry Turner & Associates | (919) 851-7150 | 5.44 | 0 | 0 | |
| 07/24/2008 | NC Hwy 55 Self Storage Sketch Plan | 08-SP-035 | NC Hwy 55 | sketch plan w/ special use- 79,300sf self storage facility | Blakely Design Group | (919) 870-1868 | 6.96 | 79,300 | 5 | |
| 07/22/2008 | Amberly Ph 2 Greenway Revisions | 06-SP-047-A | Amberly | revisions to greenway trail | Chas H Sells | (919) 678-0035 | 0 | 0 | ||
| 07/14/2008 | Del Webb Reclaimed Waterline (idt) | 08-SP-027 | Pittard Sears Rd | reclaimed waterline | Chas H Sells | (919) 678-0035 | 0 | 0 | ||
| 07/14/2008 | Dr. Lane & Associates | 08-SP-019 | Green Level West Road | New Dental Office | Red Line Engineering, P.C. | (919) 606-4560 | 1.05 | 5,438 | 1 | |
| 07/14/2008 | La-Z-Boy Walnut Street | 08-SP-018 | Walnut St | Furniture Store and Retail/Office Building | Elam, Todd, d'Ambrosi, PA | (919) 481-2021 | 2.79 | 25,390 | 1 | |
| 07/14/2008 | Parkway Professional (idt) | 08-SP-029 | SE Cary Parkway | 11,970 office building | Chas H Sells | (919) 678-0035 | 11,970 | 1 | ||
| 07/14/2008 | Weldon Ridge Phase II-C | 05-SB-031-B | South of Ivyshaw Rd & Bridle | note removed from site layout page | Withers & Ravenel | (919) 469-3340 | 0 | 0 | ||
| 06/30/2008 | Kellogg's Cary Bakery Expansion (idt) | 08-SP-043 | Quality Lane | 14,000sf expansion | MA Engineering Consultants | (919) 297-0223 | 14,000 | 0 | ||
| 06/30/2008 | Prestonwood Country Club Golf Course Restroom | 08-SP-042 | Old Pro's Way | adding additional restroom on the golf course | Elam, Todd, d'Ambrosi, PA | (919) 481-2021 | 750 | 1 | ||
| 06/30/2008 | Tryon Village Townhomes | 06-SP-018-A | Walnut St | change of product type | Withers & Ravenel | (919) 469-3340 | 14.03 | 0 | 0 | |
| 06/30/2008 | WakeMed Soccer Park (idt) | 08-SP-052 | Soccer Park Drive | install 2 raised crosswalks & signage | Town of Cary | (000) 000-0000 | 0 | 0 | ||
| 06/30/2008 | Waverly Place Demolition | 08-SP-040 | Waverly Place | selective demolition & grading of plaza & lower parking area | BSC Group | (919) 854-0811 | 0 | 0 | ||
| 06/30/2008 | Weatherfield Townhomes | 06-SP-101-C | Havensite Court | phasing 06-SP-101-A | Aiken & Yelle Associates | (919) 877-9992 | 0 | 0 | ||
| 06/23/2008 | Southbridge SF-6 (idt) | 08-SB-002 | Green Level Durham Rd | 5 SF lots | Withers & Ravenel | (919) 469-3340 | 2 | 0 | 0 | |
| 06/12/2008 | Falcone Point at Old Apex | 08-SP-003 | Old Apex Rd | 7 townhomes | Bass, Nixon & Kennedy | (919) 851-4422 | 0.64 | 10,500 | 2 | |
| 06/09/2008 | Middle Creek Speed Humps (idt) | 08-SP-036 | Middle Creek Park Ave | addition of speed humps | Town of Cary | (000) 000-0000 | 0 | 0 | ||
| 06/09/2008 | Powell Flex Building | 08-SP-012 | Kitty Hawk Drive | 12,960sf warehouse | Rivers & Associates | (919)861-6257 | 2.13 | 12,960 | 1 | |
| 06/04/2008 | Turner Creek Elementary Modular Addition | 02-SP-070-A | Turner Creek Road | addition of 1 mobile classroom | Rotman Architecture, PA | (919) 835-9988 | 0 | 1 | ||
| 05/29/2008 | Davis Drive Office Park | 07-SP-088 | Davis Drive | 27,388 sf office | Clearwater Enginering | (919) 848-8506 | 2.67 | 27,388 | 1 | |
| 05/29/2008 | Maynard Village MUSP | 07-MU-008 | Chapel Hill Rd | Commercial, Office, Bank, Residential | Jerry Turner & Associates | (919) 851-7150 | 16.06 | 0 | 0 | |
| 05/27/2008 | Annie Jones Renovation (idt) | 08-SP-037 | Tarbert Drive | removing greenway trail & parking spaces; new sidewalk | Town of Cary | (000) 000-0000 | 0 | 0 | 0 | |
| 05/27/2008 | Cary First United Methodist Parking Revisions | 07-SP-030-A | Waldo Street | revisions to grading | Mulkey Engineers & Consultants | (919) 858-1888 | 0 | 0 | ||
| 05/27/2008 | Cary Park Sanitary Sewer Extension (idt) | 08-SP-028 | Green Level to Durham Rd | sanitary sewer | Withers & Ravenel | (919) 469-3340 | 0 | 0 | ||
| 05/27/2008 | Maynard Creek Subdivision | 07-SB-003 | Reedy Creek Road | 12 SF lot subdivision | William G. Daniel & Assoc | (919) 467-9708 | 4.73 | 0 | 0 | |
| 05/27/2008 | Waterford @ Cary Park (Lot MR-2B) | 06-SP-033-A | Courtland View Lane & Cary Glen Blvd | subdividing Lot MR-2B | J. Davis Architects | (919) 835-1500 | 0 | 0 | ||
| 05/27/2008 | Waterford at Cary Park (Lot MR-2A) | 08-SP-045 | Courtland View Lane & Cary Glen Blvd | subdividing Lot MR-2A | J. Davis Architects | (919) 835-1500 | 0 | 0 | ||
| 05/27/2008 | Waverly Place Stock Pile | 08-SP-041 | Waverly Place | temporary stockpile | BSC Group | (919) 854-0811 | 0 | 0 | ||
| 05/12/2008 | Kingdom Hall of Jehovah's Witnesses | 08-SP-004 | Old Apex Rd | 11,3500sf religious assembly and service Hall | John Nichols | (910) 512-2334 | 3.91 | 11,375 | 1 | |
| 05/12/2008 | Phillips Swift Creek | 07-SP-112 | Old Apex Rd | 196 Apartment Units | Stewart Engineering, Inc. | (919) 380-8750 | 13.18 | 239,196 | 9 | |
| 05/12/2008 | Stonewater Village Center | 07-SP-124 | O'Kelly Chapel Road & Green Level to Durham Rd | 95,403sf shopping center | Chas H Sells | (919) 678-0035 | 22.91 | 95,403 | 0 | |
| 05/05/2008 | Residences at the Arboretum Revisions | 05-SP-025-A | Renaissance Park Place | revision to utilities, building elevations, site layout | Withers & Ravenel | (919) 469-3340 | 0 | 0 | ||
| 05/01/2008 | Bradford | 07-SP-114 | Davis Drive & High House Rd | 370 apartments, 20 townhomes, 132,500sf comm, 7,500sf office | Withers & Ravenel | (919) 469-3340 | 41.84 | 140,000 | 10 | |
| 04/28/2008 | Crescent Lakeside Monumentation | 08-SP-033 | Crescent Green | entry feature | Withers & Ravenel | (919) 469-3340 | 0 | 0 | ||
| 04/28/2008 | Gateway Bank Preston | 07-SP-125 | SW intersection of SW Cary Pkwy & High House Rd | 6,864sf bank | Elam, Todd, d'Ambrosi, PA | (919) 481-2021 | 1.43 | 6,864 | 1 | |
| 04/28/2008 | Samuel's Keep Townhomes | 06-SP-043-B | West Chatham and Old Apex Rd | revisions to grading & stormwater | Bass, Nixon & Kennedy | (919) 851-4422 | 0 | 0 | ||
| 04/28/2008 | Springfield at Twin Lakes | 07-SP-102 | McCrimmon Pkway | 157 townhomes | Withers & Ravenel | (919) 469-3340 | 13.89 | 0 | 0 | |
| 04/14/2008 | Amberly Medical Office Building | 07-SP-122 | O'Kelly Chapel Road | 28,000sf two-story medical office | Chas H Sells | (919) 678-0035 | 4.6 | 28,000 | 1 | |
| 04/11/2008 | Progress Energy Substation Expansion | 08-SP-011 | Piney Plains Road | 312sf building addition | Davis-Martin-Powell & Assoc., | (336) 886-4821 | 312 | 0 | ||
| 04/10/2008 | Briarcliff Elementary Mobile Classrooms | 08-SP-014 | Pond Street | installation of 4 mobile classroom units | Jones Architecture | (919) 510-8186 | 18.01 | 3,456 | 4 | |
| 04/10/2008 | NC 55 Greenway Connection | 08-SP-015 | Between 3100 NC-55 & 2880 NC-55 | connecting missing segments of greenway | Steward Engineering | (704) 334-7925 | 0.6 | 0 | 0 | |
| 04/02/2008 | Parkside Town Commons Sketch | 07-SP-012 | NE of Hwy 55 & I-540 | mix of apartments (534), cinema, office & retail | Mulkey Engineers & Consultants | (919) 858-1888 | 135 | 0 | 0 | |
| 04/02/2008 | Pleasant Grove Business Park | 07-SP-109 | Pleasant Grove Church Rd | 262,000 SF Office Building Complex and Site Improvements | Arcadis | (919) 854-1282 | 32.95 | 262,000 | 4 | |
| 04/02/2008 | Walnut Street Park | 07-SP-027 | Intersection of Walnut & Lawrence | construction of neighborhood park | OBS Landscape Architects | (919) 755-0046 | 10.82 | 286 | 1 | |
| 03/31/2008 | Coronado Village Section 2 | 08-SB-001 | Ralph Dr | 2 SF lots | Jacob | (919) 481-6290 | 0.56 | 0 | 2 | |
| 03/31/2008 | CVS @ Cary Park Town Center Revision | 07-SP-040-A | Carpenter Fire Station Rd | move sidewalk, curb alignment | Carter & Burgess, Inc | (919) 859-5000 | 1.71 | 0 | 0 | |
| 03/31/2008 | Macedonia United Methodist Church | 03-SP-217-D | Jones Franklin Rd | modifications to parking lot and bioretention ponds | Stewart Engineering, Inc. | (919) 380-8750 | 6.76 | 0 | 0 | |
| 03/31/2008 | North State Storage Revisions | 08-SP-026 | Sowter Dr | 10' sidewalk | Civil Consultants | (919) 490-1645 | 2.79 | 0 | 0 | |
| 03/31/2008 | Weatherfield Townhomes PH-2 | 06-SP-101-B | Havensite Court | Phasing Plan for Weatherfield Townhomes | Aiken & Yelle Associates | (919) 877-9992 | 7.1 | 0 | 0 | |
| 03/26/2008 | Friendship Corner Revision | 07-SB-002-A | Allen Lewis Dr | relocate roundabouts | Chas H Sells | (919) 678-0035 | 3.56 | 0 | 0 | |
| 03/18/2008 | Manchester Park Townhomes | 07-SP-016 | McCrimmon Pkwy | 124 townhomes | Chas H Sells | (919) 678-0035 | 16.6 | |||
| 03/13/2008 | Alston Ridge Elementary School | 07-MU-010 | Alston Ave | Elementary School | CLH Design, Pa | (919) 319-6716 | 18.56 | 0 | 0 | |
| 03/13/2008 | Evans Farm Subdivision | 07-SB-004 | Green Level To Durham Road | 139 SF lots | Withers & Ravenel | (919) 469-3340 | 84.22 | 0 | 0 | |
| 03/10/2008 | Alston Ridge Elementary School | 07-SP-116 | Alston Avenue | 104,584sf elementary school | CLH Design | (919) 319-6716 | 18.56 | 104,584 | 0 | |
| 03/10/2008 | Camden Park Townhomes Revisions | 06-SP-031-B | Cary Park & Cary Glen Blvd | shifting unit location w/ lot line revisions; utility easement adjustments | Withers & Ravenel | (919) 469-3340 | 0 | 0 | ||
| 03/10/2008 | Chancery Village at the Park | 07-SP-099 | Alston Ave | 276 apartments | Elam, Todd, d'Ambrosi, PA | (919) 481-2021 | 15.68 | 0 | 0 | |
| 03/10/2008 | Davis Drive Middle School Mobile Classrooms | 08-SP-013 | Davis Drive | installation of 2 mobile classroom units | Jones Architecture | (919) 510-8186 | 1,728 | 2 | ||
| 03/10/2008 | Mills Park Elementary | 07-SP-022-B | Mills Park Drive | addition of right turn lane & access drive #2 | Dewberry | (919) 881-9939 | 0 | 0 | ||
| 03/05/2008 | Highland Village PDD Amendment | 03-SP-023-D | High House Road | amendments to previously approved PDD | Cline Design Associates | (919) 833-6413 | 0 | 0 | ||
| 03/05/2008 | Kraft Family YMCA Waterline Extension | 08-SP-007 | Holly Springs Rd | waterline extension | Withers & Ravenel | (919) 469-3340 | 0 | 0 | ||
| 02/25/2008 | Camden Townhomes Entry Feature | 05-SP-037-C | Cary Glen Blvd | entry feature | Jerry Turner & Associates | (919) 851-7150 | 0 | 0 | ||
| 02/25/2008 | Carolina Preserve Ph 2V Elevation Revisions | 06-SP-013-B | Amberly | revisions to elevations & building footprint | Chas H Sells | (919) 678-0035 | 0 | 0 | ||
| 02/25/2008 | Carolina Preserve PH-3 Utility & Phasing Revisions | 06-SP-079-A | O'Kelly Chapel Rd | revised Phaselines for Utilities and Sewer | Chas H Sells | (919) 678-0035 | 146.5 | 0 | 0 | |
| 02/25/2008 | GCF Center Parking Expansion | 08-SP-001 | Kilmayne Dr | parking expansion | Development Engineering | (919) 847-8300 | 2.06 | 0 | 0 | |
| 02/25/2008 | Scandariato Office | 07-SP-129 | S. Harrison Street | convert 1,389sf 3-car garage to 2-story office bldg | Womble Carlyle Sandridge & Ric | (919) 755-2100 | 0.48 | 1,389 | 1 | |
| 02/20/2008 | Olde Towne @ Carpenter Village Apartments | 99-SP-008-G | Eton Hall Lane | Parking Reduction Minor Modification | Womble Carlyle Sandridge & Ric | (919) 755-2100 | 16.97 | 0 | 0 | |
| 02/18/2008 | Village Square @ Amberly | 07-SP-044 | Amberly | 57 townhomes & 30,000 sf commercial bldg. | Chas. H. Sells | (919) 678-0035 | 9.43 | 30,000 | 1 | |
| 02/14/2008 | Saxonbury Singh Subdivision | 07-SB-012 | Green Level Road West | 43 single family lots | Elam, Todd, d'Ambrosi, PA | (919) 481-2021 | 19.27 | 0 | 0 | |
| 02/11/2008 | 161 NW Maynard | 07-SP-110 | NW Maynard Rd | Office Buildings | Joel Moulin | (919) 280-9744 | 2.93 | 16,440 | 2 | |
| 02/11/2008 | Amberly Reclaimed Waterline (Phase 2) | 07-SP-075 | McCrimmon Pkwy | Reclaimed Waterline | Chas H Sells | (919) 678-0035 | 0 | 0 | ||
| 02/11/2008 | Bright Beginnings Daycare | 07-SP-069 | Bright Beginnings Way | 3,000sf daycare | Blakely Design Group | (919) 870-1868 | 3.1 | 3,000 | 1 | |
| 02/11/2008 | Fairview Shopping Center Revisions | 07-SP-006-A | intersection of Ten Ten & Holly Springs Rd | site & elevation changes to blgs A,B,C | Jerry Turner & Associates | (919) 851-7150 | 0 | 0 | 0 | |
| 02/11/2008 | Grove @ Weldon Ridge Townhomes, The | 07-SP-073 | Yates Store Rd & Weldon Rdige Blvd | 98 townhomes | Withers & Ravenel | (919) 469-3340 | 22.42 | 0 | 0 | |
| 02/11/2008 | Old Apex Center Zoning Conditions | 06-SP-098-A | Old Apex Road | update zoning conditions to allow 5,850sf of personal service use | Elam, Todd, d'Ambrosi, PA | (919) 481-2021 | 0 | 0 | ||
| 02/11/2008 | Town of Cary West Maintenance Facility | 07-SP-071 | Thomas Brooks Park | 7,574sf maintenance facility | Mulkey Engineers & Consultants | (919) 858-1888 | 126.8 | 7,574 | 1 | |
| 02/11/2008 | Waverly Place PH1 | 07-SP-108 | Kildaire Farm and Tryon | Wachovia Bank Site | BSC Group | (919) 854-0811 | 1.16 | 4,000 | 1 | |
| 02/11/2008 | Weldon Ridge Roadway Phase 2 | 07-SP-117 | Weldon Ridge | second phase of Yates Store road construction | Withers & Ravenel | (919) 469-3340 | 0 | 0 | ||
| 01/28/2008 | Aldi Entry Monument | 06-SP-062-B | NW Maynard Road | entry monument | Hugh J. Gilleece & Assoc. | (919) 469-1101 | 0 | 0 | ||
| 01/28/2008 | Carpenter Village Outdoor Pavilion | 08-SP-002 | Eton Hall Lane | 836 sf open sided Pavilion | Jerry Turner & Associates | (919) 851-7150 | 0.11 | 836 | 1 | |
| 01/28/2008 | Crescent Lakeside Bldg 2 Phase 2 & 3 Revisions | 05-SP-097-B | Crescent Green | revisions to parking, landscape, utilities, storm drainage | Withers & Ravenel | (919) 469-3340 | 0 | 0 | ||
| 01/28/2008 | High House Office Center Revisions | 06-SP-044-A | High House & Maynard Rd | changes to entry feature, landscape, sidewalk configuration, removal of 3 parking spaces | Jerry Turner & Associates | (919) 851-7150 | 0 | 0 | ||
| 01/28/2008 | Hilliard Forest Revisions | 06-SB-006-A | Green Hope School Rd | reduction in lots, sign easements, & revision to lot numbers | Withers & Ravenel | (919) 469-3340 | 0 | 0 | ||
| 01/28/2008 | Peninsula @ Amberly Phasing Revisions | 03-SB-012-C | Yates Store & New Hope Church | revising phase lines for Phases 5 & 8 | Chas H Sells | (919) 678-0035 | 0 | 0 | ||
| 01/28/2008 | Wake Med-Cary Hospital | 06-SP-124-A | Kildaire Farm Road | 8,000sf expansion to Women's Pavilion | Elam, Todd, d'Ambrosi, PA | (919) 481-2021 | 1 | 8,000 | 0 | |
| 01/28/2008 | Weatherfield Townhomes PH-1 | 06-SP-101-A | Havensite Court | Phasing Plan for Weatherfiled PH-1 | Aiken & Yelle Associates | (919) 877-9992 | 7.1 | 0 | 0 | |
| 01/22/2008 | Waltonwood @ Cary Assisted Living Facility | 07-SP-043 | NW Corner SE Cary Pkwy & US1 | 171 independent/assisted living | Steward Engineering | (704) 334-7925 | 17.5 | 253,689 | 7 | |
| 01/17/2008 | Coorsdale PH- 2 &3 | 07-SP-101 | Pindale Springs Way | 55,000 SF office building | Arcadis | (919) 854-1282 | 6.9 | 55,000 | 1 | |
| 01/10/2008 | JM Thompson Flex Building | 07-SP-090 | Travis Park Drive | 6,680 sf building with parking | Gontram Architecture, Inc | (919) 876-5331 | 2.74 | 6,680 | 1 | |
| 01/03/2008 | Cornerstone Lot 5 Office Building | 05-SP-130-A | Cornerstone Drive | reduction from 25,000sf to 18,000sf | Withers & Ravenel | (919) 469-3340 | 4.34 | -7,000 | 0 |