| Project Name | Project Number | Street Name | Proposed Use Comments | Developer Name | Developer Phone Number | Acreage | Building Sq. Ft. | Number of Buildings | Approval Date |
| Adams Elementary School Speed Humps | 06-SP-076 | Cary Town Blvd | installation of speed humps | No Developer | (000) 000-0000 | 0.00 | 0 | 07/31/2006 | |
| Advantage Group Realty IV | 05-SP-154 | High House Rd | two Story office building - 15,000 SF | Development Engineering | (919) 847-8300 | 1.67 | 1,550.00 | 0 | 03/31/2006 |
| Advantage Group Realty IV | 05-SP-154-A | High House Road | Bioretention pond revised | Development Engineering | (919) 847-8300 | 0.00 | 0 | 11/27/2006 | |
| Aldi Grocery Store | 06-SP-062 | NW Maynard & Harrision Ave. | proposing 16,000sf grocery store | Jerry Turner & Associates | (919) 851-7150 | 2.88 | 16,000.00 | 0 | 09/11/2006 |
| Alston Avenue Roadway Improvements | 06-SP-084 | N.Alston Avenue | Improvements along Waterford Estates Frontage | Withers & Ravenel | (919) 469-3340 | 3.61 | 0.00 | 0 | 11/27/2006 |
| Alston Towne Center Collector Street "A" | 06-SP-064 | McCrimmon Parkway | alignment of collector street | John R. McAdams Company, Inc. | (919) 361-5000 | 0.00 | 0 | 07/31/2006 | |
| Amberly Greenway North of Lake Amberly | 06-SP-048 | Amberly | greenway from Allforth Drive to Green Level Durham Rd | Chas H Sells | (919) 678-0035 | 0.00 | 0 | 07/31/2006 | |
| Amberly Roadway Improvements | 06-SP-047 | Amberly | roadway improvements along Yates Store Rd | Chas H Sells | (919) 678-0035 | 0.00 | 0 | 06/12/2006 | |
| Amberly Roadway Improvements Phase 3 | 06-SP-110 | O'Kelly Chapel Rd | roadway improvements | Chas. H. Sells | (919) 678-0035 | 0.00 | 0 | 10/30/2006 | |
| Amberly Village Square Phasing | 05-SB-010-A | Amberly | phasing plan | Chas H Sells | (919) 678-0035 | 0.00 | 0 | 07/10/2006 | |
| American Soil & Mulch Office | 04-SP-153-A | NC Hwy 55 | relocation of storage facilities | Chas H Sells | (919) 678-0035 | 6.53 | 0.00 | 0 | 05/30/2006 |
| Arboretum Phase 2 Revisions | 05-SP-001-A | Renaissance Park Place & N. Harrison | addition of parking; landscaping, lighting, & stormwater revisions | Withers & Ravenel | (919) 469-3340 | 0.00 | 0 | 07/10/2006 | |
| Arbors @ Weldon Ridge, The | 06-SP-126 | Green Level Church Rd, & Yates Store Rd. | Entrance monument addition | Withers & Ravenel | (919) 469-3340 | 0.00 | 0 | 12/27/2006 | |
| Arby's | 06-SP-067 | Kildaire Farm | 1 story 2,895sf restaurant | Omni Consulting Services | (770) 486-8398 | 0.8 | 2,895.00 | 0 | 08/21/2006 |
| Ardmore @ Reedy Creek | 06-SP-049 | NE Maynard Rd | entry feature | Wood Graphics | (919) 875-4234 | 0.00 | 0 | 05/15/2006 | |
| Balmoral | 03-SP-145-A | Queensferry Rd | revise townhome unit for next phase w/ increase of 3 units | Jerry Turner & Associates | (919) 851-7150 | 13.4 | 0.00 | 0 | 01/23/2006 |
| BB&T Bank | 06-SP-089 | Cornerstone Drive | 5,626sf bank | Commercial Site Design | (919) 848-6121 | 1.67 | 5,626.00 | 0 | 10/23/2006 |
| Bedford @ Twin Lakes | 04-SB-021-B | Town Hall Dr | change of development name | Withers & Ravenel | (919) 469-3340 | 0.00 | 0 | 01/27/2006 | |
| Bedford @ Twin Lakes Entry Features | 04-SB-021-A | Town Hall Drive & Meander Blue Street | entry features | Withers & Ravenel | (919) 469-3340 | 0.00 | 0 | 02/27/2006 | |
| Bentley's American Grill | 05-SP-149 | Crossroads | landscaping, parking, & facade renovations | Intergrated Design | (919) 832-6658 | 1.5 | 6,362.00 | 0 | 01/09/2006 |
| Black Creek Greenway Phase 4 Section 11B | 05-SP-030 | greenway trail | Haden Stanziale | (919) 286-7440 | 0.00 | 0 | 02/08/2006 | ||
| Black Creek Greenway Trail Relocation | 04-SP-169-A | Off Weston Pkwy on Greenway | relocate previously approved greenway trail | Withers & Ravenel | (919) 469-3340 | 1 | 0.00 | 0 | 01/30/2006 |
| Blizzard Property | 06-SP-044 | High House & Maynard Rd | 26,112sf office bldg | Jerry Turner & Associates | (919) 851-7150 | 2.49 | 26,112.00 | 0 | 11/13/2006 |
| Bower, The | 06-SB-016 | Reedy Creeek Rd | 14 lot subdivision | William G. Daniel & Assoc | (919) 467-9708 | 6.17 | 0.00 | 0 | 12/11/2006 |
| Brandywine | 05-SB-026 | South of Trinity, West of I-40 | 89 SF units | Hugh J. Gilleece & Assoc. | (919) 469-1101 | 46.58 | 0.00 | 0 | 05/30/2006 |
| Camden Townhomes @ Cary Park Rephasing | 05-SP-037-A | Cary Glen Blvd | phase 1 being split into phase 1A & phase 1B | John R. McAdams Company, Inc. | (919) 361-5000 | 26.72 | 0.00 | 0 | 05/30/2006 |
| Cape Fear Sanitary Sewer System Phase 1B | 05-SP-048 | Louis Stephens Dr | gravity sewer to serve rtp lots 23, 24, 26, & 27 and relieve breckenridge pump station | Wooten Company, The | (919) 828-0531 | 0.00 | 0 | 03/27/2006 | |
| Capital Neurology | 05-SP-141 | Walnut St | conversion of residence to commercial office | Henry Dagit | (919) 601-5375 | 1.3 | 2,202.00 | 0 | 01/23/2006 |
| Carolina Preserve by Del Webb Phase 2 Phasing | 05-SB-002-A | Amberly | phasing plan | Chas H Sells | (919) 678-0035 | 0.00 | 0 | 05/01/2006 | |
| Carolina Preserve Recreation Center Revisions | 05-SP-135-A | Del Webb Ave & Allforth Place | revisions to pool deck, bocee court, & amenties | Chas. H. Sells | (919) 678-0035 | 32,525.00 | 1 | 11/27/2006 | |
| Carramore SF-1 (Phase 2&3); SF-2 (Ph 2), SF-3A | 04-SB-012-A | Davis Dr | phasing | Withers & Ravenel | (919) 469-3340 | 62 | 0.00 | 0 | 02/27/2006 |
| Cary Academy Athletic Fields | 06-SP-006 | N. Harrison Ave | athletic fields including concessions & future field house | McNeely Associates, PA | (919) 782-9677 | 67.61 | 208,860.00 | 0 | 05/10/2006 |
| Cary Christian School Field Expansion | 06-SP-118 | Old Apex road | Addition of a multi-use field to campus | Mulkey Engineers & Consultants | (919) 858-1888 | 0.00 | 0 | 12/27/2006 | |
| Cary Christian School Phase 2 | 06-SP-059 | Old Apex Road | addition of gym, utilities & sidewalks | Mulkey Engineers & Consultants | (919) 858-1888 | 20.73 | 5,162.00 | 0 | 06/12/2006 |
| Cary Church of God | 03-SP-101-A | Quade Drive | changes in building elevations | Bobbitt & Associates, Inc. | (919) 851-1980 | 11.5 | 59,830.00 | 0 | 05/22/2006 |
| Cary High School Classroom Addition | 04-SP-120-B | Walnut Street | mobile classroom addition | CLH Design | (919) 319-6716 | 2.42 | 14,848.00 | 0 | 11/27/2006 |
| Cary Mixed Use | 06-SP-016 | W. Chatham St. | revsions | Cline Design Associates | (919) 833-6413 | 0.98 | 9,549.00 | 0 | 03/13/2006 |
| Cary Park M-6 Townhomes | 06-SP-031 | Cary Glen Blvd | proposing 84 townhome units | Withers & Ravenel | (919) 469-3340 | 10.98 | 0.00 | 0 | 08/14/2006 |
| Cary Park TC-3 | 05-SB-035 | Carpenter Fire Station Rd & Cary Glen Rd | proposing 200 SF units | Withers & Ravenel | (919) 469-3340 | 28.99 | 0.00 | 0 | 04/04/2006 |
| Cary Park Town Center Revisions | 05-SP-058-A | Carpenter Fire Station Rd & Gren Level to Durham | changes to landscaping, lighting, utilites & stormdrainage | Withers & Ravenel | (919) 469-3340 | 17.82 | 0.00 | 0 | 10/16/2006 |
| Cary Parkway Plaza Grading Revisions | 04-SP-167-A | SW Cary Pkwy | grading revisions | Greenhorne & Omara, Inc. | (919) 851-1919 | 7.69 | 0.00 | 0 | 01/09/2006 |
| Cary Towne Center Renovation | 06-SP-056 | Walnut Street | façade renovation, parking, sidewalk,& landscape revision | Artech Design Group | (423) 643-0617 | 0.00 | 0 | 06/26/2006 | |
| Centrum Station | 05-SP-074 | Dillard Dr & Meeting St | 18000 sf commercial including 2080 sf restaurants | Hugh J. Gilleece & Assoc. | (919) 469-1101 | 2.358 | 18,000.00 | 0 | 02/23/2006 |
| Chessway Drive Connection | 06-SP-070 | Davis Drive | Connection to Twin Lakes | Withers & Ravenel | (919) 469-3340 | 0.00 | 0 | 08/08/2006 | |
| Chick-fil-A | 05-SP-142 | Stone Creek Village | 4227 sf one store bldg | G. Robert George & Associates, | (843) 571-0276 | 0.9 | 4,227.00 | 0 | 01/23/2006 |
| Cole's Creek Subdivision | 06-SB-002 | NW Maynard | site includes 38 SF lots | Jerry Turner & Associates | (919) 851-7150 | 22.05 | 0.00 | 0 | 05/15/2006 |
| Colonial Baptist Church (Phase 2 Expansion) | 04-SP-176-A | Tryon Road | site raised vertically 1 foot | Withers & Ravenel | (919) 469-3340 | 33.85 | 41,189.00 | 0 | 03/27/2006 |
| Copperleaf Subdivision | 05-SB-016 | Green Level Church Rd | 137 SF homes | Pinnacle Design Engineering | (919) 337-0134 | 137.6 | 0.00 | 0 | 04/04/2006 |
| Cornerstone Presbyterian Church Revisions | 03-SP-035-A | High House Rd | revised building elevations | Chas H Sells | (919) 678-0035 | 0.00 | 0 | 01/30/2006 | |
| Cotton Incorporated | 05-SP-139 | Weston Parkway | installation of speed humps | Highwoods Properties | (919) 872-4924 | 0.00 | 0 | 01/09/2006 | |
| Courtney Reserve at Cary Park Revisions | 05-SP-096-A | Cary Glen Blvd & Carpenter Fire Station | revisions | John A. Edwards & Company | (919) 828-4428 | 11.1 | 0.00 | 0 | 02/27/2006 |
| Crescent Lakeside One Phase 2 Bldg B | 05-SP-097 | Crescent Green | 144000 sq ft office bldg | Withers & Ravenel | (919) 469-3340 | 20.58 | 144,000.00 | 0 | 01/17/2006 |
| Crescent Overlook (Phase 1) | 06-SP-072 | Crescent Commons Dr | parking areas | Withers & Ravenel | (919) 469-3340 | 0.00 | 0 | 08/14/2006 | |
| Crossroads Plaza Improvements | 05-SP-082 | Crossroads Shopping Center | internal road improvements | Ramey Kemp & Associates, Inc | (919) 878-5416 | 0.00 | 0 | 02/13/2006 | |
| Crossroads Plaza Roadway Revisions | 05-SP-082-A | Crossroads | roadway revisions located in Area 1 | Ramey Kemp & Associates, Inc | (919) 878-5416 | 0.00 | 09/25/2006 | ||
| Crossroads Plaza Shopping Center | 06-SP-029 | Crossroads Blvd | inclusion of existing monument sign in site plan | Ronus Properties | (678) 553-4051 | 0.00 | 0 | 03/27/2006 | |
| Davidson Point Townhomes Revisions | 05-SP-031-A | Reedy Creek Rd | add'l retaining wall, parking, relocation of units | Jerry Turner & Associates | (919) 851-7150 | 5.48 | 0.00 | 0 | 05/15/2006 |
| Davis Drive Daycare | 05-SP-155 | Davis Drive across from Davis Dr Middle School | proposing 10,855 sf daycare facility | Arcadis | (919) 854-1282 | 9.63 | 10,855.00 | 0 | 04/07/2006 |
| Davis Drive Elementary Modular Addition | 06-SP-050 | Davis Drive | addition of 2 mobile classrooms | HS Annis Architects | (919) 772-5565 | 864.00 | 0 | 05/15/2006 | |
| Davis Drive Elementary Parking Addition | 06-SP-039 | Davis Drive | additional 24 parking spaces for staff | McNeely Associates, PA | (919) 782-9677 | 0.00 | 0 | 05/01/2006 | |
| Davis Drive Phase II | 06-SP-060 | Davis Drive across from middle school | 36,600sf office & 69,675sf self storage | Arcadis | (919) 854-1282 | 7.96 | 106,275.00 | 0 | 07/24/2006 |
| deVintage Subdivision | 04-SB-019-A | Sonoma Valley Drive | addition of 4 lots along existing right-of-way | Withers & Ravenel | (919) 469-3340 | 22.19 | 0.00 | 0 | 08/01/2006 |
| Downing Village Phase 4 | 03-SP-063-G | Beech Hanger Dr | greenway trail re-location | Elam, Todd, d'Ambrosi, PA | (919) 481-2021 | 0.00 | 0 | 12/11/2006 | |
| Downing Village Phasing | 03-SP-063-F | Town Hall Drive & Downing Glen Drive | phase 6 revision: 5-500 series units & 13-600 series units to 18-200 units | Elam, Todd, d'Ambrosi, PA | (919) 481-2021 | 0.00 | 0 | 05/15/2006 | |
| Dr.Privette Dental Office | 06-SP-086 | Northwoods Drive | 3,953 sf Dental Office | CPS Engineers P.A. | (919) 552-4845 | 0.53 | 3,953.00 | 0 | 12/11/2006 |
| Dry Avenue Professional Offices | 06-SP-115 | Dry Avenue | conversion of residence into offices | 2SL Design Build | (919) 833-1448 | 0.43 | 1,340.00 | 0 | 12/27/2006 |
| Farmington Woods Elementary Modular Addition | 06-SP-051 | Hampton Valley Road | addition of 3 mobile units | HS Annis Architects | (919) 772-5565 | 20 | 2,592.00 | 0 | 05/30/2006 |
| Five Guys | 06-SP-082 | S.E. Maynard Rd | change in use- from bank to restaurant | LMHT Associates | (919) 845-3936 | 0.98 | 2,964.00 | 0 | 09/25/2006 |
| Gallup Subdivision | 05-SB-018 | North end of Fairbanks Rd | 6 single-family lots | Jerry Turner & Associates | (919) 851-7150 | 6.76 | 0.00 | 0 | 01/17/2006 |
| Gateway Centre Expansion | 06-SP-078 | Gateway Centre Blvd | proposing 3,813sq addition | Horvath Associates, PA | (919) 490-4990 | 2.89 | 3,813.00 | 0 | 08/28/2006 |
| Genesis United Methodist Church | 05-SP-150 | High House Rd | parking lot expansion | Piedmont Land Design, LLP | (919) 845-7600 | 6.91 | 0.00 | 0 | 02/13/2006 |
| Glenaire Wellness Center Expansion | 05-SP-060 | W Cornwall Rd | expansion of the wellness center | Mulkey Engineers & Consultants | (919) 858-1888 | 31.61 | 16,000.00 | 0 | 01/03/2006 |
| Governor's Row | 05-SB-022 | N Harrison across from Melody Lane | proposing 28 single family units | Withers & Ravenel | (919) 469-3340 | 20.14 | 0.00 | 0 | 01/17/2006 |
| Grace Church Sanitary Sewer Extension | 06-SP-001 | Ambrose Park Lane | 173 LF of sewer main to serve Grace Church | Withers & Ravenel | (919) 469-3340 | 0.00 | 0 | 02/27/2006 | |
| Green Hope HS Mobile Addition | 06-SP-097 | Carpenter Upchurch Rd | installation of 5 ea 864sf mobile units | HS Annis Architects | (919) 772-5565 | 4,320.00 | 0 | 11/20/2006 | |
| Greenwood Baptist Church | 05-SP-145 | SE Maynard Rd | 22,487 sf addition | The Roberts Group | (919) 831-1831 | 5.73 | 22,487.00 | 0 | 02/23/2006 |
| Greyhawk Landing Entry Feature | 06-SP-009 | Ten Ten Road | entrance feature | Laura Moore Designs | (919) 933-1599 | 0.00 | 0 | 03/13/2006 | |
| Greystone Phasing | 05-SB-019-A | Green Level to Durham Road | revise phasing to include lot 248 in SF-2A | Withers & Ravenel | (919) 469-3340 | 0.00 | 0 | 05/30/2006 | |
| Greystone PPD, Rec.Site Sanitary Sewer Extension | 06-SP-117 | Greyston PUD | sanitary sewer extension | Withers & Ravenel | (919) 469-3340 | 0.00 | 0 | 12/12/2006 | |
| Greystone Sanitary Sewer Extension | 05-SP-156 | Greystone PUD | sanitary sewer extension | Withers & Ravenel | (919) 469-3340 | 0.00 | 0 | 02/13/2006 | |
| Greystone SF-1 | 05-SB-024 | Green Level to Durham Rd | proposing 45 sf homes | Withers & Ravenel | (919) 469-3340 | 15.44 | 0.00 | 0 | 01/30/2006 |
| Greystone Subdivision 2A & 2B | 05-SB-019 | Green Level to Durham Rd | 49 sf homes | Withers & Ravenel | (919) 469-3340 | 13.89 | 0.00 | 0 | 01/17/2006 |
| Greystone Thoroughfare Improvements PH2 | 05-SB-019-B | Green Level Church Rd | Rural thoroughfare improvements | Withers & Ravenel | (919) 469-3340 | 0.00 | 0 | 12/27/2006 | |
| Haddock Auto Body | 06-SP-042 | NW Maynard Rd | 20,421sf auto body repair center | Development Engineering | (919) 847-8300 | 3.14 | 20,421.00 | 0 | 08/14/2006 |
| Haddock Collision Center Landscape | 06-SP-042-A | NW Maynard Rd | modify landscaping & parking adjacent to bldgs | Development Engineering | (919) 847-8300 | 0.00 | 0 | 11/14/2006 | |
| Harmony Recreation Center | 06-SP-046 | NE Corner of Turner Creek & Affinity Lane | 5,000sf rec bldg & pool | Chas H Sells | (919) 678-0035 | 2.3 | 5,000.00 | 0 | 09/11/2006 |
| Harmony Subdivision | 05-SB-023 | Turner Creek PDD | proposing 300 SF homes | Chas H Sells | (919) 678-0035 | 138 | 0.00 | 0 | 05/15/2006 |
| Havensite Townhomes | 05-SP-132 | Havensite Ct | 160 townhome units | Aiken & Yelle Associates | (919) 877-9992 | 15.69 | 0.00 | 0 | 05/01/2006 |
| Heritage Pines Drainage Retrofit | 06-SP-073 | Carpenter Upchurch Road | overall drainage retrofit | Hugh J. Gilleece & Assoc. | (919) 469-1101 | 0.00 | 0 | 07/10/2006 | |
| Heritage Pines Louis Stephens Phase 3 | 06-SP-035 | Carpenter Fire Station Rd | road & utility extension | Bass, Nixon & Kennedy | (919) 851-4422 | 0.00 | 0 | 05/15/2006 | |
| High House Crossing Urgent Care | 06-SP-014 | Green Level West & Hwy 55 | 7,888sf medical office | The Prescott Company | (919) 698-2803 | 1.35 | 7,888.00 | 0 | 06/12/2006 |
| Highcroft Commons | 05-SP-093 | Hwy 55 & Green Hope School Rd | 4248 sf gas station/carwash | Jerry Turner & Associates | (919) 851-7150 | 6.033 | 18,000.00 | 0 | 03/13/2006 |
| Highcroft Elementary Modular Addition | 02-SP-107-A | Highcroft Drive | addition of modular units | Gurel Architecture | (919) 468-1717 | 0.00 | 0 | 05/01/2006 | |
| Highcroft Village Entry Features | 05-SB-034-A | Green Hope School Rd | entry features | Jerry Turner & Associates | (919) 851-7150 | 0.00 | 0 | 05/01/2006 | |
| Highcroft Village Tract 1&2 | 05-SB-034 | Green Hope School Road | proposing 100 single-family units | Withers & Ravenel | (919) 469-3340 | 36.52 | 0.00 | 0 | 11/06/2006 |
| Highland Village Revisions | 03-SP-023-B | High House Rd | Community Bldg reduced in size, 1 mail location, changes to landscape | Cline Design Associates | (919) 833-6413 | 17.98 |