Project Name Project Number Street Name Proposed Use Comments Developer Name Developer Phone Number Acreage Building Sq. Ft. Number of Buildings Approval Date
Adams Elementary School Speed Humps 06-SP-076 Cary Town Blvd installation of speed humps No Developer (000) 000-0000   0.00 0 07/31/2006
Advantage Group Realty IV 05-SP-154 High House Rd two Story office building - 15,000 SF Development Engineering (919) 847-8300 1.67 1,550.00 0 03/31/2006
Advantage Group Realty IV 05-SP-154-A High House Road Bioretention pond revised Development Engineering (919) 847-8300   0.00 0 11/27/2006
Aldi Grocery Store 06-SP-062 NW Maynard & Harrision Ave. proposing 16,000sf grocery store Jerry Turner & Associates (919) 851-7150 2.88 16,000.00 0 09/11/2006
Alston Avenue Roadway Improvements 06-SP-084 N.Alston Avenue Improvements along Waterford Estates Frontage Withers & Ravenel (919) 469-3340 3.61 0.00 0 11/27/2006
Alston Towne Center Collector Street "A" 06-SP-064 McCrimmon Parkway alignment of collector street John R. McAdams Company, Inc. (919) 361-5000   0.00 0 07/31/2006
Amberly Greenway North of Lake Amberly 06-SP-048 Amberly greenway from Allforth Drive to Green Level Durham Rd Chas H Sells (919) 678-0035   0.00 0 07/31/2006
Amberly Roadway Improvements 06-SP-047 Amberly roadway improvements along Yates Store Rd Chas H Sells (919) 678-0035   0.00 0 06/12/2006
Amberly Roadway Improvements Phase 3 06-SP-110 O'Kelly Chapel Rd roadway improvements Chas. H. Sells (919) 678-0035   0.00 0 10/30/2006
Amberly Village Square Phasing 05-SB-010-A Amberly phasing plan Chas H Sells (919) 678-0035   0.00 0 07/10/2006
American Soil & Mulch Office 04-SP-153-A NC Hwy 55 relocation of storage facilities Chas H Sells (919) 678-0035 6.53 0.00 0 05/30/2006
Arboretum Phase 2 Revisions 05-SP-001-A Renaissance Park Place & N. Harrison addition of parking; landscaping, lighting, & stormwater revisions Withers & Ravenel (919) 469-3340   0.00 0 07/10/2006
Arbors @ Weldon Ridge, The 06-SP-126 Green Level Church Rd, & Yates Store Rd. Entrance monument addition Withers & Ravenel (919) 469-3340   0.00 0 12/27/2006
Arby's 06-SP-067 Kildaire Farm 1 story 2,895sf restaurant Omni Consulting Services (770) 486-8398 0.8 2,895.00 0 08/21/2006
Ardmore @ Reedy Creek 06-SP-049 NE Maynard Rd entry feature Wood Graphics (919) 875-4234   0.00 0 05/15/2006
Balmoral 03-SP-145-A Queensferry Rd revise townhome unit for next phase w/ increase of 3 units Jerry Turner & Associates (919) 851-7150 13.4 0.00 0 01/23/2006
BB&T Bank 06-SP-089 Cornerstone Drive 5,626sf bank Commercial Site Design (919) 848-6121 1.67 5,626.00 0 10/23/2006
Bedford @ Twin Lakes 04-SB-021-B Town Hall Dr change of development name Withers & Ravenel (919) 469-3340   0.00 0 01/27/2006
Bedford @ Twin Lakes Entry Features 04-SB-021-A Town Hall Drive & Meander Blue Street entry features Withers & Ravenel (919) 469-3340   0.00 0 02/27/2006
Bentley's American Grill 05-SP-149 Crossroads landscaping, parking, & facade renovations Intergrated Design (919) 832-6658 1.5 6,362.00 0 01/09/2006
Black Creek Greenway Phase 4 Section 11B 05-SP-030   greenway trail Haden Stanziale (919) 286-7440   0.00 0 02/08/2006
Black Creek Greenway Trail Relocation 04-SP-169-A Off Weston Pkwy on Greenway relocate previously approved greenway trail Withers & Ravenel (919) 469-3340 1 0.00 0 01/30/2006
Blizzard Property 06-SP-044 High House & Maynard Rd 26,112sf office bldg Jerry Turner & Associates (919) 851-7150 2.49 26,112.00 0 11/13/2006
Bower, The 06-SB-016 Reedy Creeek Rd 14 lot subdivision William G. Daniel & Assoc (919) 467-9708 6.17 0.00 0 12/11/2006
Brandywine 05-SB-026 South of Trinity, West of I-40 89 SF units Hugh J. Gilleece & Assoc. (919) 469-1101 46.58 0.00 0 05/30/2006
Camden Townhomes @ Cary Park Rephasing 05-SP-037-A Cary Glen Blvd phase 1 being split into phase 1A & phase 1B John R. McAdams Company, Inc. (919) 361-5000 26.72 0.00 0 05/30/2006
Cape Fear Sanitary Sewer System Phase 1B 05-SP-048 Louis Stephens Dr gravity sewer to serve rtp lots 23, 24, 26, & 27 and relieve breckenridge pump station Wooten Company, The (919) 828-0531   0.00 0 03/27/2006
Capital Neurology 05-SP-141 Walnut St conversion of residence to commercial office Henry Dagit (919) 601-5375 1.3 2,202.00 0 01/23/2006
Carolina Preserve by Del Webb Phase 2 Phasing 05-SB-002-A Amberly phasing plan Chas H Sells (919) 678-0035   0.00 0 05/01/2006
Carolina Preserve Recreation Center Revisions 05-SP-135-A Del Webb Ave & Allforth Place revisions to pool deck, bocee court, & amenties Chas. H. Sells (919) 678-0035   32,525.00 1 11/27/2006
Carramore SF-1 (Phase 2&3); SF-2 (Ph 2), SF-3A 04-SB-012-A Davis Dr phasing Withers & Ravenel (919) 469-3340 62 0.00 0 02/27/2006
Cary Academy Athletic Fields 06-SP-006 N. Harrison Ave athletic fields including concessions & future field house McNeely Associates, PA (919) 782-9677 67.61 208,860.00 0 05/10/2006
Cary Christian School Field Expansion 06-SP-118 Old Apex road Addition of a multi-use field to campus Mulkey Engineers & Consultants (919) 858-1888   0.00 0 12/27/2006
Cary Christian School Phase 2 06-SP-059 Old Apex Road addition of gym, utilities & sidewalks Mulkey Engineers & Consultants (919) 858-1888 20.73 5,162.00 0 06/12/2006
Cary Church of God 03-SP-101-A Quade Drive changes in building elevations Bobbitt & Associates, Inc. (919) 851-1980 11.5 59,830.00 0 05/22/2006
Cary High School Classroom Addition 04-SP-120-B Walnut Street mobile classroom addition CLH Design (919) 319-6716 2.42 14,848.00 0 11/27/2006
Cary Mixed Use 06-SP-016 W. Chatham St. revsions Cline Design Associates (919) 833-6413 0.98 9,549.00 0 03/13/2006
Cary Park M-6 Townhomes 06-SP-031 Cary Glen Blvd proposing 84 townhome units Withers & Ravenel (919) 469-3340 10.98 0.00 0 08/14/2006
Cary Park TC-3 05-SB-035 Carpenter Fire Station Rd & Cary Glen Rd proposing 200 SF units Withers & Ravenel (919) 469-3340 28.99 0.00 0 04/04/2006
Cary Park Town Center Revisions 05-SP-058-A Carpenter Fire Station Rd & Gren Level to Durham changes to landscaping, lighting, utilites & stormdrainage Withers & Ravenel (919) 469-3340 17.82 0.00 0 10/16/2006
Cary Parkway Plaza Grading Revisions 04-SP-167-A SW Cary Pkwy grading revisions Greenhorne & Omara, Inc. (919) 851-1919 7.69 0.00 0 01/09/2006
Cary Towne Center Renovation 06-SP-056 Walnut Street façade renovation, parking, sidewalk,& landscape revision Artech Design Group (423) 643-0617   0.00 0 06/26/2006
Centrum Station 05-SP-074 Dillard Dr & Meeting St 18000 sf commercial including 2080 sf restaurants Hugh J. Gilleece & Assoc. (919) 469-1101 2.358 18,000.00 0 02/23/2006
Chessway Drive Connection 06-SP-070 Davis Drive Connection to Twin Lakes Withers & Ravenel (919) 469-3340   0.00 0 08/08/2006
Chick-fil-A 05-SP-142 Stone Creek Village 4227 sf one store bldg G. Robert George & Associates, (843) 571-0276 0.9 4,227.00 0 01/23/2006
Cole's Creek Subdivision 06-SB-002 NW Maynard site includes 38 SF lots Jerry Turner & Associates (919) 851-7150 22.05 0.00 0 05/15/2006
Colonial Baptist Church (Phase 2 Expansion) 04-SP-176-A Tryon Road site raised vertically 1 foot Withers & Ravenel (919) 469-3340 33.85 41,189.00 0 03/27/2006
Copperleaf Subdivision 05-SB-016 Green Level Church Rd 137 SF homes Pinnacle Design Engineering (919) 337-0134 137.6 0.00 0 04/04/2006
Cornerstone Presbyterian Church Revisions 03-SP-035-A High House Rd revised building elevations Chas H Sells (919) 678-0035   0.00 0 01/30/2006
Cotton Incorporated 05-SP-139 Weston Parkway installation of speed humps Highwoods Properties (919) 872-4924   0.00 0 01/09/2006
Courtney Reserve at Cary Park Revisions 05-SP-096-A Cary Glen Blvd & Carpenter Fire Station revisions John A. Edwards & Company (919) 828-4428 11.1 0.00 0 02/27/2006
Crescent Lakeside One Phase 2 Bldg B 05-SP-097 Crescent Green 144000 sq ft office bldg Withers & Ravenel (919) 469-3340 20.58 144,000.00 0 01/17/2006
Crescent Overlook (Phase 1) 06-SP-072 Crescent Commons Dr parking areas Withers & Ravenel (919) 469-3340   0.00 0 08/14/2006
Crossroads Plaza  Improvements 05-SP-082 Crossroads Shopping Center internal road improvements Ramey Kemp & Associates, Inc (919) 878-5416   0.00 0 02/13/2006
Crossroads Plaza Roadway Revisions 05-SP-082-A Crossroads roadway revisions located in Area 1 Ramey Kemp & Associates, Inc (919) 878-5416   0.00   09/25/2006
Crossroads Plaza Shopping Center 06-SP-029 Crossroads Blvd inclusion of existing monument sign in site plan Ronus Properties (678) 553-4051   0.00 0 03/27/2006
Davidson Point Townhomes Revisions 05-SP-031-A Reedy Creek Rd add'l retaining wall, parking, relocation of units Jerry Turner & Associates (919) 851-7150 5.48 0.00 0 05/15/2006
Davis Drive Daycare 05-SP-155 Davis Drive across from Davis Dr Middle School proposing 10,855 sf daycare facility Arcadis (919) 854-1282 9.63 10,855.00 0 04/07/2006
Davis Drive Elementary Modular Addition 06-SP-050 Davis Drive addition of 2 mobile classrooms HS Annis Architects (919) 772-5565   864.00 0 05/15/2006
Davis Drive Elementary Parking Addition 06-SP-039 Davis Drive additional 24 parking spaces for staff McNeely Associates, PA (919) 782-9677   0.00 0 05/01/2006
Davis Drive Phase II 06-SP-060 Davis Drive across from middle school 36,600sf office & 69,675sf self storage Arcadis (919) 854-1282 7.96 106,275.00 0 07/24/2006
deVintage Subdivision 04-SB-019-A Sonoma Valley Drive addition of 4 lots along existing right-of-way Withers & Ravenel (919) 469-3340 22.19 0.00 0 08/01/2006
Downing Village Phase 4 03-SP-063-G Beech Hanger Dr greenway trail re-location Elam, Todd, d'Ambrosi, PA (919) 481-2021   0.00 0 12/11/2006
Downing Village Phasing 03-SP-063-F Town Hall Drive & Downing Glen Drive phase 6 revision: 5-500 series units & 13-600 series units to 18-200 units Elam, Todd, d'Ambrosi, PA (919) 481-2021   0.00 0 05/15/2006
Dr.Privette Dental Office 06-SP-086 Northwoods Drive 3,953 sf Dental Office CPS Engineers P.A. (919) 552-4845 0.53 3,953.00 0 12/11/2006
Dry Avenue Professional Offices 06-SP-115 Dry Avenue conversion of residence into offices 2SL Design Build (919) 833-1448 0.43 1,340.00 0 12/27/2006
Farmington Woods Elementary Modular Addition 06-SP-051 Hampton Valley Road addition of 3 mobile units HS Annis Architects (919) 772-5565 20 2,592.00 0 05/30/2006
Five Guys 06-SP-082 S.E. Maynard Rd change in use- from bank to restaurant LMHT Associates (919) 845-3936 0.98 2,964.00 0 09/25/2006
Gallup Subdivision 05-SB-018 North end of Fairbanks Rd 6 single-family lots Jerry Turner & Associates (919) 851-7150 6.76 0.00 0 01/17/2006
Gateway Centre Expansion 06-SP-078 Gateway Centre Blvd proposing 3,813sq addition Horvath Associates, PA (919) 490-4990 2.89 3,813.00 0 08/28/2006
Genesis United Methodist Church 05-SP-150 High House Rd parking lot expansion Piedmont Land Design, LLP (919) 845-7600 6.91 0.00 0 02/13/2006
Glenaire Wellness Center Expansion 05-SP-060 W Cornwall Rd expansion of the wellness center Mulkey Engineers & Consultants (919) 858-1888 31.61 16,000.00 0 01/03/2006
Governor's Row 05-SB-022 N Harrison across from Melody Lane proposing 28 single family units Withers & Ravenel (919) 469-3340 20.14 0.00 0 01/17/2006
Grace Church Sanitary Sewer Extension 06-SP-001 Ambrose Park Lane 173 LF of sewer main to serve Grace Church Withers & Ravenel (919) 469-3340   0.00 0 02/27/2006
Green Hope HS Mobile Addition 06-SP-097 Carpenter Upchurch Rd installation of 5 ea 864sf mobile units HS Annis Architects (919) 772-5565   4,320.00 0 11/20/2006
Greenwood Baptist Church 05-SP-145 SE Maynard Rd 22,487 sf addition The Roberts Group (919) 831-1831 5.73 22,487.00 0 02/23/2006
Greyhawk Landing Entry Feature 06-SP-009 Ten Ten Road entrance feature Laura Moore Designs (919) 933-1599   0.00 0 03/13/2006
Greystone Phasing 05-SB-019-A Green Level to Durham Road revise phasing to include lot 248 in SF-2A Withers & Ravenel (919) 469-3340   0.00 0 05/30/2006
Greystone PPD, Rec.Site Sanitary Sewer Extension 06-SP-117 Greyston PUD sanitary sewer extension Withers & Ravenel (919) 469-3340   0.00 0 12/12/2006
Greystone Sanitary Sewer Extension 05-SP-156 Greystone PUD sanitary sewer extension Withers & Ravenel (919) 469-3340   0.00 0 02/13/2006
Greystone SF-1 05-SB-024 Green Level to Durham Rd proposing 45 sf homes Withers & Ravenel (919) 469-3340 15.44 0.00 0 01/30/2006
Greystone Subdivision 2A & 2B 05-SB-019 Green Level to Durham Rd 49 sf homes Withers & Ravenel (919) 469-3340 13.89 0.00 0 01/17/2006
Greystone Thoroughfare Improvements PH2 05-SB-019-B Green Level Church Rd Rural thoroughfare improvements Withers & Ravenel (919) 469-3340   0.00 0 12/27/2006
Haddock Auto Body 06-SP-042 NW Maynard Rd 20,421sf auto body repair center Development Engineering (919) 847-8300 3.14 20,421.00 0 08/14/2006
Haddock Collision Center Landscape 06-SP-042-A NW Maynard Rd modify landscaping & parking adjacent to bldgs Development Engineering (919) 847-8300   0.00 0 11/14/2006
Harmony Recreation Center 06-SP-046 NE Corner of Turner Creek & Affinity Lane 5,000sf rec bldg & pool Chas H Sells (919) 678-0035 2.3 5,000.00 0 09/11/2006
Harmony Subdivision 05-SB-023 Turner Creek PDD proposing 300 SF homes Chas H Sells (919) 678-0035 138 0.00 0 05/15/2006
Havensite Townhomes 05-SP-132 Havensite Ct 160 townhome units Aiken & Yelle Associates (919) 877-9992 15.69 0.00 0 05/01/2006
Heritage Pines Drainage Retrofit 06-SP-073 Carpenter Upchurch Road overall drainage retrofit Hugh J. Gilleece & Assoc. (919) 469-1101   0.00 0 07/10/2006
Heritage Pines Louis Stephens Phase 3 06-SP-035 Carpenter Fire Station Rd road & utility extension Bass, Nixon & Kennedy (919) 851-4422   0.00 0 05/15/2006
High House Crossing Urgent Care 06-SP-014 Green Level West & Hwy 55 7,888sf medical office The Prescott Company (919) 698-2803 1.35 7,888.00 0 06/12/2006
Highcroft Commons 05-SP-093 Hwy 55 & Green Hope School Rd 4248 sf gas station/carwash Jerry Turner & Associates (919) 851-7150 6.033 18,000.00 0 03/13/2006
Highcroft Elementary Modular Addition 02-SP-107-A Highcroft Drive addition of modular units Gurel Architecture (919) 468-1717   0.00 0 05/01/2006
Highcroft Village Entry Features 05-SB-034-A Green Hope School Rd entry features Jerry Turner & Associates (919) 851-7150   0.00 0 05/01/2006
Highcroft Village Tract 1&2 05-SB-034 Green Hope School Road proposing 100 single-family units Withers & Ravenel (919) 469-3340 36.52 0.00 0 11/06/2006
Highland Village Revisions 03-SP-023-B High House Rd Community Bldg reduced in size, 1 mail location, changes to landscape Cline Design Associates (919) 833-6413 17.98