BOARD OF ADJUSTMENT HEARING
July
14, 2003
|
CASE: |
03-V-007 |
|
STAFF
CONTACT: |
Beth
Lewis |
|
APPLICANT(S): |
William
C. Graham |
|
LOCATION: |
100 Fawn
Court, |
|
OWNER(S): |
William
C. Graham |
|
PRESENT
ZONING: |
Residential
12 (R12) |
|
SETBACK: |
Front
20 |
|
|
REQUEST: |
The
applicant is requesting a variance of 5 to the required 10 side yard
setback in the area of the rear corner to construct a 20 wide garage
addition to a single-family residence.
The garage encroaches for a distance of approximately 10 in
length into the required setback. |
VARIANCE
WORKSHEET
FACTORS
RELEVANT TO THE ISSUANCE OF A VARIANCE:
The
variance process is intended to provide limited relief from the UDO in those
cases where strict application of a particular requirement will create a
practical difficulty or unnecessary hardship prohibiting the use of land in a
manner otherwise allowed under the UDO.
A variance is not designed to remove inconveniences or financial burdens,
but to provide relief where the requirements of the UDO render the land
difficult or impossible to use because of some unique physical attribute of the
property itself or some other factor unique to the property for which the
variance is requested. (Sec. 6.1.1)
The
Board may not grant variance that would
·
permit
establishment of a use which is not otherwise allowed, or
·
change
the zoning district classification, or
·
vary
any written conditions attached by Council to a special use, subdivision plat,
site plan or conditional use
district or master plan for a PUD, or
·
vary
any standard where Council alone acts (sexually oriented business and
Thoroughfare Corridor Buffer)
The
Standard for issuing a variance, as set forth in Sec. 6.1.5. (a)
The Board may grant a variance, which is in harmony with the general purpose and
intent of the zoning ordinance. (b)
When practical difficulties or unnecessary hardships would result from carrying
out the strict letter of the zoning ordinance , the Board may vary or modify the
regulation or provisions of the ordinance, so that the spirit of the ordinance
shall be observed, public safety and welfare secured, and substantial justice
done.
The
applicant is requesting a variance of 5 to the required 10 side yard
setback in the area of the rear corner to construct a 20 wide garage addition
to a single-family residence. The
garage encroaches for a distance of approximately 10 in length into the
required setback. The residence currently has no garage.
Undisputed
facts:
1.
The property
is owned by William C. Graham, who has requested the variance.
2.
The property
has the following dimensions: The property is a triangle, with approximately
170 along each property line. The
property is 3/10 of an acre.
3.
The property
is developed with a single-family residence.
4.
The property
is zoned R12, which is Residential 12, and requires a 20 front yard setback,
a 25 rear yard setback, and 10 side yard setbacks.
5.
The applicant
is unable to obtain a building permit for the proposed garage, as it would
encroach the required 10 side yard setback by 5.
If
you are inclined to grant the
If you are inclined to deny the
variance request, follow this route:
variance request, follow
|
6.
There are practical difficulties or unnecessary hardships that
exist on the property. The
property has a shape that makes the addition of a garage in another
location difficult. |
6.
There are no practical difficulties or unnecessary hardships that
exist on the property. The
property has been developed with a single-family residence. |
|
7.
The conditions are not the result of the applicants own doing.
The lot was platted and the residence built when the applicant
purchased the parcel. |
7.
The conditions are the result of the applicants own doing.
The applicant purchased the residence aware of the
lack of a garage and the unusual shape. |
|
8.
The applicant is not able to obtain a building permit.
The garage as planned, a 20 wide structure, would not fit in the
planned location without encroaching the setback in an area. |
8.
The applicant is able to obtain a building permit.
The garage could be moved forward approximately 10, to stay out
of the setback. It could also
be moved to the other side of the residence. |
|
9.
There is insufficient space on the property to construct the
proposed structure. There is
insufficient space on this site in this location to construct the planned
garage in the desired location without encroaching setbacks. |
9.
There is sufficient space on the property to construct a garage
without encroaching any easements or setbacks, if the garage was
relocated. |
|
10.
There is no other practical use of the property, because _____. |
10.
There is other practical use of the property.
The property is currently developed as a single-family residence. |
|
11.
The construction will not have a negative effect on adjoining
property, as evidenced by _______. |
11.
The construction may have a negative effect on adjoining property,
as the structure will be 5 from the property line at its closest. |
|
12.
Construction of the garage will not impair emergency access, create
a fire hazard, or otherwise be contrary to public health, as evidenced by
___. |
12.
Construction of the garage will impair emergency access, create a
fire hazard, or otherwise be contrary to public health, as evidenced by
______________. |
|
13.
Requiring certain conditions to be met will alleviate the problems
with granting the variance. The
conditions are ___________. |
13.
Requiring certain conditions to be met will not alleviate the
problems with granting the variance. |
After
conducting a duly advertised public hearing and reviewing the application,
testimony and evidence and the general purposes of the UDO, we find the
following
FACTS:
We hereby finds facts 1 through 5
and ________.[insert facts found]
CONCLUSION:
1.
Based on the
application, testimony and evidence, the general purposes of the UDO, and the
above findings, the Board concludes that the variance requested would be in
harmony with the general purpose and intent of the zoning ordinance, and that
there are practical difficulties or unnecessary hardships that result from
carrying out the strict letter of the Cary UDO.
2.
The applicant
is hereby granted a variance to construct a 20 wide garage at
3.
This variance
is conditioned upon:
-
the garage being
constructed such that the encroachment
is minimized by __________________.
-
construction of a
fence.
-
installation of a
buffer.
After
conducting a duly advertised public hearing and reviewing the application,
testimony and evidence and the general purposes of the UDO, we find the
following
CONCLUSION:
1.
Based on the
application, testimony and evidence, the general purposes of the UDO, and the
above findings, the Board concludes that the variance requested would not be in
harmony with the general purpose and intent of the UDO, and that there are no
practical difficulties or unnecessary hardships that result from carrying out
the strict letter of the Cary UDO, and the application is DENIED.