A. WATER DEVELOPMENT FEE: These charges are in addition to water and sewer tap charges (see table of Utility Connection Fees in the Operating Budget Fee Schedule). The water and sewer development fees are based on the total area under roof in square feet for residential property and are based on the size of the water meter serving non-residential property at an equivalent dwelling unit rate of $1,836 for water using 435 gallons on a peak day. These fees are due at building permit issuance. The schedule of charges for the water development fee, as required by Town Code (Chapter 19), shall be as follows.
|
RESIDENTIAL FEES |
NON-RESIDENTIAL FEES |
|
|
Square Feet |
Development Fee |
Based upon the high degree of variability in non-residential uses and flow rates, these fees are calculated
by Town of $3.87
/ peak day gallons. Please contact the
Town of |
|
< 1,700 |
$1,353 |
|
|
1,701 - 2,400 |
1,495 |
|
|
2,401 - 3,100 |
1,836 |
|
|
3,101 - 3,800 |
2,075 |
|
|
> 3,800 |
2,618 |
|
|
Irrigation Meter |
408 |
|
|
Apartments, per unit |
1,184 |
|
B. SEWER DEVELOPMENT FEE: These charges are in addition to water and sewer tap charges (see table of Utility Connection Fees in the Operating Budget Fee Schedule). The water and sewer development fees are based on the total area under roof in square feet for residential property and are based on the size of the water meter serving non-residential property at an equivalent dwelling unit rate of $2,877 for sewer using 348 gallons on an average day. These fees are due at building permit issuance. The schedule of charges for the sewer development fee, as required by Town Code (Chapter 19) shall be as follows.
|
RESIDENTIAL FEES |
NON-RESIDENTIAL FEES |
|
|
Square Feet |
Development Fee |
Based upon the high degree of variability in non-residential uses and flow rates, these fees are calculated by Town staff using a rate of $7.58 / average day gallons. Please contact the Town of at (919) 469-4336 to assist with the calculation of non-residential sewer development fees that will be due at the time of building permit issuance. |
|
< 1,700 |
$2,336 |
|
|
1,701 - 2,400 |
2,367 |
|
|
2,401 - 3,100 |
2,877 |
|
|
3,101 - 3,800 |
3,124 |
|
|
> 3,800 |
3,559 |
|
|
Irrigation Meter |
N/A |
|
|
Apartments, per unit |
1,933 |
|
|
|
|
|
C. SPECIAL UTILITY AREAS: In areas designated by the Town Council as a Special Utility Area, a combined
water and sewer development fee shall be collected. The combined development fee shall be the combined fee for
both water and sewer development fees based on the schedule of charges for development fees.
D. STANDARD UNIT PRICES FOR OVERSIZE REIMBURSEMENT REQUESTS:
WATER SYSTEMS OVERSIZE REIMBURSEMENT CHARTS
|
|
LINE SIZE REQUIRED BY THE TOWN OF |
|||||||
|
|
|
8 |
10 |
12 |
16 |
20 |
24 |
30 |
|
|
8 |
$0 |
$4 |
$7 |
$14 |
$21 |
$29 |
$40 |
|
SIZE REQUIRED |
10 |
0 |
0 |
4 |
10 |
18 |
26 |
37 |
|
TO SERVE THE |
12 |
0 |
0 |
0 |
7 |
14 |
22 |
33 |
|
PROJECT |
16 |
0 |
0 |
0 |
0 |
7 |
15 |
26 |
|
|
20 |
0 |
0 |
0 |
0 |
0 |
8 |
19 |
|
|
24 |
0 |
0 |
0 |
0 |
0 |
0 |
11 |
|
BORE &
JACK |
LINE SIZE REQUIRED BY THE TOWN OF |
|||||||
|
|
|
8 |
10 |
12 |
16 |
20 |
24 |
30 |
|
|
8 |
$0 |
$7 |
$21 |
$28 |
$35 |
$53 |
$74 |
|
SIZE REQUIRED |
10 |
0 |
0 |
14 |
21 |
28 |
46 |
67 |
|
TO SERVE THE |
12 |
0 |
0 |
0 |
7 |
14 |
32 |
53 |
|
PROJECT |
16 |
0 |
0 |
0 |
0 |
7 |
25 |
46 |
|
|
20 |
0 |
0 |
0 |
0 |
0 |
18 |
39 |
|
|
24 |
0 |
0 |
0 |
0 |
0 |
0 |
21 |
|
VALVES |
LINE SIZE REQUIRED BY THE TOWN OF |
|||||||
|
|
|
8 |
10 |
12 |
16 |
20 |
24 |
30 |
|
|
8 |
$0 |
$250 |
$450 |
$1,750 |
$3,600 |
$4,500 |
$8,650 |
|
SIZE REQUIRED |
10 |
0 |
0 |
200 |
1,500 |
3,400 |
4,200 |
8,400 |
|
TO SERVE THE |
12 |
0 |
0 |
0 |
1,300 |
3,150 |
4,000 |
8,200 |
|
PROJECT |
16 |
0 |
0 |
0 |
0 |
1,200 |
2,750 |
6,900 |
|
|
20 |
0 |
0 |
0 |
0 |
0 |
850 |
5,050 |
|
|
24 |
0 |
0 |
|||||