TOWN OF CARY
DEVELOPMENT PLAN REPORT
Thomas Brooks Park,
Phase Two
Site Plan Approval
03-SP-230
|
APPLICANT
|
OWNER
|
|
Mulkey
Engineering & Consultants
|
Town
of
Cary
|
|
Location:
Map:
|
Thomas
Brooks Park is located south of Green Hope School Road, east of
Green Level Church Road, and west of the proposed I-540 expressway,
at 100 Brooks Drive. The
Phase Two section of development would be located in the northeast
area of the Park.
|
|
Development Review Group Recommendation:
|
Staff
recommends approval of the plan with the following conditions:
1.
That the 100 Thoroughfare Corridor Buffer
District (TCBD) be allowed to vary in width, providing the average
overall buffer width maintained is 100;
2.
That the applicant install evergreen plantings
within all Thoroughfare Buffer encroachment areas to achieve an
opaque screen;
3.
That all Phase Two ball field lighting utilize a
glare control package to minimize off-site glare;
4.
That the streetscape adjacent to
Green
Level Church Road
be reforested to its
original state;
5.
That an evergreen tree screen be installed along
Green
Level Church Road
;
6.
That widening of the Parks eastern Green Hope
School Road frontage be delayed until completion of I-540 across
Green Hope School Road; and
7.
That modifications to the riparian buffer area be
allowed by utilizing proposed land banking at a 3:1 ratio.
Note that roadway widening
along the eastern side of
Green Level Church
Road
is incorporated into this plan.
The ultimate roadway section is to be determined by the Town
Council as a part of the Southwest Area Plan.
|
|
Planning and Zoning Board Recommendation:
|
The
Planning and Zoning Board voted to approve the plan as recommended
by the staff. The vote
also included installing a glare control package on existing ball
field lighting within the existing Phase One area of the park.
The vote to approve the plan was 9 to 0.
|
|
PROPOSED
SCHEDULE OF MEETINGS
|
|
Planning and Zoning Board
|
March
15, 2004
(Tabled)
May
17, 2004
|
|
Town Council
|
June
10, 2004
|
|
PROJECT DESCRIPTION
|
|
The
applicant, Mulkey Engineers & Associates, representing the Town
of
Cary
, has requested approval
of a site plan to construct four new baseball fields, a clubhouse
building, a maintenance building, ticket booths, restroom buildings,
and associated parking in the northeastern portion of Thomas Brooks
Park.
|
|
PROJECT DESCRIPTION
(Continued)
|
|
The
Phase Two area of Thomas Brooks Park would be accessed by one drive
from
Green Hope School Road
and by an internal
drive connecting the existing Phase One area of development to the
proposed Phase Two area of the Park.
The Park contains 149.53 acres and is located at
100 Brooks Park Lane
.
The plans propose a 20 reduction of the two eastern-most
ball fields into the 100 Thoroughfare Corridor Buffer District (TCBD).
The plans also propose to compensate for the reduction by
providing additional buffer area at other locations along the
eastern side of the Park, thereby providing a TCBD that would
average at least 100 in width.
In addition, the plans include roadway widening along
Green Hope School Road
at the entrance into
the Park and along
Green Level Church Road
for the length of the
Park Frontage. The Land
Development Ordinance (LDO) requires that all TCBD reductions be
approved by the Town Council. The
LDO also provides for Town Council consideration on averaging buffer
and streetscape widths, provided that the overall average width is
equal to the required streetscape/buffer width.
The LDO supports the proposed TCBD reduction proposed in the
Phase Two area of Thomas Brooks Park.
The actual area of reduction is 4,839; square feet and this
area is being replaced with 5,417 square feet of buffer area.
Additionally, the required landscape screening proposed
within the TCBD would be doubled in areas where the TCBD width is
less than 100'. The
Council has approved similar buffer reductions for previous site
plans when the applicant has provided additional buffer area in
excess of the area being disturbed.
Examples of similar past considerations include the
RDU
Center
and the North Cary
Water Reclamation Plant. In
addition, the applicant is required to provide the appropriate
landscaping to achieve a type A opaque buffer.
In this case, the applicant is providing additional buffer
area and landscape screening that exceeds
Cary
s opaque buffer
standards.
Due
to the proposed design of the four fields, relocating the fields out
of the TCBD is problematic. The
four fields proposed in phase two could not be moved without
encroaching into southern and western riparian buffer areas.
(Grading would have disturbed a significant amount of
riparian buffer area south and west of the fields.)
The staff has concluded that there would be less overall
impact if the four fields were to remain at the proposed locations.
Progress
Energy has also agreed to locate 55 of a proposed future 70
wide overhead electrical transmission line easement within the TCBD
adjacent to I-540. At
least 15 of the easement would be located in the proposed I-540
roadway right-of-way, leaving 45 of the 100 TCBD available for
planting.
|
PARCEL INFORMATION
|
|
Parcel
#
|
Realid
#
|
Area
|
|
0734.13-04-9820
0734.01-25-1988
0734.01-15-7421
0734.01-15-7747
0734.01-16-7192
|
|
126.80
acres
10.27 acres
3.40 acres
4.53 acres
4.53 acres
|
|
Total
Park
Acreage:
|
|
149.53
acres
|
|
ZONING AND LAND USE PLAN
COMPLIANCE
|
|
Current
Zoning: Resource/Recreation
District (R/R) &
Residential-40 District (R-40)
Town
Limits:
Excluding approximately 22.73 acres located in the northeast area,
the Park is inside
Cary
's
town limits. An
annexation petition has been submitted for the area currently
outside
Cary
s
town limits, and the property would be annexed prior to construction
of the Phase Two area of development.
Land
Use Compliance: The Land Use Plan allows for low density
residential development and parks.
|
|
LANDSCAPE
|
|
As previously mentioned, the plans propose a 20 encroachment
of the two eastern-most ball fields into the TCBD.
The actual area of reduction of the TCBD is 4,839 square
feet, and this area is being replaced with 5,417 square feet of
buffer area.
Additionally,
the landscape screening required would be doubled in areas where the
TCBD width is less than 100' as follows:
1.
Northeastern signature field:
·
Staggered row of
Nellie Steven Holly spaced 8 on center (15 -25 high,
10-15 spread)
·
Single row of Magnolia
spaced 20 on center (40-60 high, 25-30 spread)
·
Hardwood combination
of Maple, Oak and Sweet-gum spaced 20 on center (60-80
high, 30-40 spread)
2.
Southeastern practice field:
·
Single row of Red
Cedar spaced 8 on center (40-50 high, 8-20 spread)
·
Double off-set row of
Loblolly Pine spaced 10 to 12 on center (70-90 high,
30-40 spread)
·
Double off-set row of
Hardwood combination of Maple, Oak and Sweet-gum spaced 20 on
center (60-80 high, 30-40 spread)
3.
A grouping of 30 Long Leaf Pine is proposed between the two
ball fields at 15-18 on center (80-100 high, 30-40
spread)
Tree height and
tree spread shown represent plant sizes at maturity.
Normal required
plantings would consist of upper-story trees spaced 20 on center
and an under-story evergreen screening hedge of plants spaced 5
on center and maintained at a minimum height of 6.
All proposed
plantings would be located out of the proposed Progress Energy
overhead electrical transmission line easement and in the remaining
45 of TCBD area.
As
required by the Land Development Ordinance, staff has recommended
that the western streetscape area along
Green Level Church Road
be upgraded to a natural forest
setting to replace the existing forest removed to construct the
Phase One area of development. The
Green Level neighborhood has also requested that an evergreen tree
screen be installed along
Green Level Church Road
. The evergreen tree screen
is needed to help reduce the amount of glare from ball field
lighting in the Phase One area of the Park and to help reduce
off-site noise from the Park.
|
|
BUILDING ELEVATION
|
|
Building
Height:
Clubhouse: 22, all other buildings: 16
Building
Size: Total
building square footage proposed: 23,750 square feet.
Proposed
buildings include a Clubhouse building, two ticketing booths, a
retail sales storage building, a concessions building, a first aid
building, a press box building, two restroom buildings, and a
maintenance building.
Building
Materials & Colors: Excluding the Clubhouse, which would utilize a
patina green standing seam metal roof system, all other buildings
would utilize a flat roof. The
flat roof building wall would terminate at the top of the parapet
with a cast stone coping. Dark
beige split-faced masonry units would be the primary field material
utilized on the exterior walls.
The exterior walls would also contain light beige vertical
trim masonry units with light green tinted glass.
All door and window framing would be clear anodized aluminum.
A tensioned cream colored fabric canopy would be located over
the seating area at the signature field.
|
SITE LIGHTING
|
|
Interior
roadway lighting and general parking area lighting would utilize a
standard shoebox 400 watt fixture on a 30 pole.
The signature ball field would utilize ball field lighting
mounted on a pole 120 to 140 high.
The three practice fields would utilize lighting that varies
in height from 80 to 90. Six
lighting locations would be provided for each field, comprising 190
individual lights per field.
Cary
s
Community Appearance regulations require that all ball field
lighting utilize a glare control package to minimize off-site glare.
Based
on concerns expressed by the Green Level neighborhood regarding
off-site glare, staff has recommended that a glare control package
be installed on both the existing ball field lighting and the
proposed ball field lighting. Funding
does not appear to be available to install a glare control package
at the existing fields, and no commitment has been made to install a
glare control package at the proposed fields.
Glare control is needed and is recommended by the staff.
|
|
|
TRAFFIC
|
|
A
Traffic Impact study was prepared by Town traffic consultant Wilbur
Smith Associates and dated October 2003. All intersections studied
meet Town of
Cary
APF
standard of levels service D or better.
|
|
|
ROADWAY DESIGN
|
|
Pursuant
to the Towns Comprehensive Transportation Plan,
Green
Hope School Road
is designated to have an
ultimate 33 back-to-back cross section (1 lane in each direction,
14 wide to accommodate bikes) centered within a minimum 55
right-of-way. Half-street
improvements from the existing centerline are required along the
park frontage. The park
has two +/- 170 sections of frontage onto
Green Hope School Road
.
Improvements to the western frontage are proposed to meet the
Towns Comprehensive Transportation Plan requirements and, in
addition, to provide enough pavement for a separate left turn lane
into the park. The
applicant is requesting Town Council grant a delay of improvements
to the eastern
Green
Hope School Road
frontage due to the pending
design and construction of I-540.
DOT is in the process of designing I-540 through this area,
which will result in
Green
Hope School Road
being straightened as it
crosses over the new road. Based
on this information, it is very likely that any improvements done to
the Parks eastern
Green Hope School Road
frontage would not remain when I-540 is constructed.
Staff recommends, therefore, delaying improvements to the
parks eastern frontage until completion of I-540 across
Green
Hope School Road
.
Pursuant
to the Towns Comprehensive Transportation Plan, Green Level
Church Road is designated to have an ultimate 102 back-to-back
cross section (3 lanes each direction with a center median and 14
wide outside lanes to accommodate bikes) centered within a 124
right-of-way. Half-street
improvements from existing centerline are required along the Park
frontage. Although not
yet included with the current plan set, design plans are underway
and
Green
Level Church Road
is proposed to be
widened to one-half its ultimate section along the Park frontage in
conjunction with development of the Phase Two area of the Park.
The improvements to
Green Level Church
Road
are required as part of the Phase Two expansion of the Park and were
specified during review and approval of Phase One of the Park.
|
|
|
UTILITIES
|
|
This
development has access to
Cary
water and sewer and complies with Town utility policies and
standards.
|
|
|
STORM WATER
|
|
Thomas Brooks
Park, PH II (Baseball USA) is located in the Jordan Lake watershed
and is addressing the watershed protection ordinance through the low
density option (impervious surface less than 24%). The project would
address
Cary
's nitrogen
requirements by producing nitrogen at 2.5 Lb. /Ac. This is less than
the allowable 3.6 Lb. /Ac.
Riparian buffers
are proposed to be modified as follows:
The plans
propose a modification from the riparian buffer requirement of the
Town's Stormwater Management Plan for new development (Chapter 7,
Part 3.7 of the Land Development Ordinance). The modification
includes impacting 0.42 acres of riparian buffer area, and
mitigating the riparian buffer loss through the installation of Best
Management Practice (Wet Pond) and the creation of 1.31 acres of
additional riparian buffer area. The Land Development Ordinance
recognizes that there may be instances where the riparian buffer
would create undue hardship and allows modifications to be granted.
The modifications must be based on documentation of practical
difficulties or unnecessary hardships and effects on water quality
caused by development within the buffers. The elimination of the
0.42 acre of riparian buffer is based, in part, on the following
criteria.
1)
The basic project
purpose cannot be practically accomplished in a manner that would
better minimize disturbance and protect water quality. Due to topographic constraints and the existing Thomas
Brooks Park Complex access roads to this phase of the park could not
be accomplished without impacts to the existing riparian buffers.
2)
The use cannot
practically be reduced in size or density or redesigned to minimize
disturbance and protect water quality. The
unique layout of the baseball complex and the amount of surface area
the complex requires cannot be reduced in size or redesigned to
lessen these riparian buffer impacts.
3)
BMP's will be used if
necessary to minimize disturbance and protect water quality. One wet pond has been designed to treat the first one-inch
of impervious runoff and remove 85% total suspended solids from the
parking area.
4)
Impact to Zone 1 must be
minimized to the maximum extent practical. Approximately 0.14 acres of impacts zone 1, which would not
otherwise be considered allowable, would be impacted with alignment
of the roadway.
5)
Compensatory
mitigation must be done on a 1:1 ratio on a square foot basis for
any impacts to Zone 1. This mitigation may consist of planting of an
un-buffered area or additional planting of a partially buffered area
located on-site or nearby. Impacts to zone 1 are being mitigated
with the creation of 1.3 acres additional riparian buffer.
6) The
applicant must receive written approval from the Town Manager
acknowledging that these conditions have been met before any impacts
to the riparian buffer shall occur. The
applicant is attempting to receive this permission at this time.
|
|
|
PROPERTY OWNER NOTIFICATION AND CONCERNS
|
|
Adjoining
property owners were notified during staff's initial review of this
plan. On
February
4, 2004
, staff met with interested neighbors and
provided a presentation of the proposed expansion plans for the
Park. Neighborhood
concerns applicable to the park expansion included:
- Providing
adequate screening to reduce off-site light glare and noise; and
- Ensuring
that the storm drainage will be appropriate for the park and the