TOWN OF CARY
DEVELOPMENT PLAN REPORT
MacGregor Ridge Condominiums
Project No. 02-SP-005

APPLICANT

OWNER

Jerry Turner & Associates, Inc.

J. Gregory Poole, Jr.

Location:

Map:

The site is located east of Edinburgh Drive, north of US Highway 64, and east of the intersection of Queensferry Drive and Edinburgh Drive.

Planning & Zoning Board Recommendation:

The Planning and Zoning Board recommended approval of the plan, with a vote of 6 yes votes to 3 no votes. The recommendation of approval included allowing the 100' Thoroughfare Corridor Buffer District to be reduced to a width of 30'.

Staff Recommendation:

Staff recommends approval of the plan. The recommendation includes allowing the 100' Thoroughfare Corridor Buffer to be reduced to 30'.

 

PROPOSED SCHEDULE OF MEETINGS

PLANNING & ZONING BOARD:

April 15, 2002

TOWN COUNCIL:

May 9, 2002

 

PROJECT DESCRIPTION

The plan proposes 28 two-story condominiums on 12.66 acres. Zoning conditions limit the maximum number of units to 48. Maximum building height would be 27'. The site would be accessed by one private drive from Edinburgh Drive, approximately 400' north of the intersection of Edinburgh Drive and US Highway 64. The plan also proposes eliminating required sidewalk along the proposed private drive and reducing the 100' Thoroughfare Corridor Buffer to 30'.

 

PARCEL INFORMATION

Parcel #

Realid #

Area

0762.13-04-3135 & 0762.13-04-0497

0121240 & 0056239

12.66 acres

 

ZONING AND LAND USE PLAN COMPLIANCE

Current Zoning: Residential Mixed Conditional Use

Overlay District: 100' Thoroughfare Corridor Buffer District

Town Limits: Inside

Land Use Compliance: Excluding a proposal to not install sidewalk along the proposed drive and to reduce the 100' Thoroughfare Corridor Buffer District to 30', the plan complies with all other zoning requirements.

Based on the number of proposed units, the applicant advises that vehicular traffic in the development would be minimal, limited to local traffic, and proposes to utilize the common access drive for pedestrian use, as well. A turf pedestrian trail would extend from the end of the private drive into the adjoining golf course area. Staff supports the request to eliminate sidewalk along the common access drive for the reasons mentioned above.

The plan proposes to reduce the southern 100' Thoroughfare Corridor Buffer District to 30' by utilizing an existing change in grade to meet the Thoroughfare Corridor Buffer regulations. The plan also proposes that evergreen landscape screening material be installed along the length of a continuous brick wall varying in height from 6' to 8'. The combination of grade change, the brick wall, and the evergreen screening material should provide adequate visual screen and noise separation from US Highway 64. The proposed reduction is also consistent with all other development plans previously approved along US Highway 64 where a reduction of the 100' Thoroughfare Corridor Buffer was allowed to either 30' or 35'.

WAKE COUNTY SCHOOL CAPACITY IMPACTS:

Current Enrollment

Area Schools

Building Capacity

Percent occupied

Projected Number of Additional Students

Elementary

14,909

13,127

113.6%

5

Middle

7,596

6,456

117.7%

3

High

5,629

5,100

110.4%

3

Total for all Area Schools

28,134

24,683

114%

11

Preschool

6

Current Enrollment and Building Capacity is based on the 20th day of the school year for 2001. School assignment will be determined at the time of development. A list of individual area schools can be reviewed at: School Data

Staff has received for this development a Certificate of Adequate Facilities for Schools from the Wake County School System. The Certificate indicates that adequate seating would be available at designated schools at the time of occupancy. Actual school locations would be announced.

LANDSCAPE

The plan complies with all landscape requirements and staff recommendations.

 

BUILDING ELEVATION

Building Height: 26'

Building Size: 3,000 square feet

Building Materials and Colors: Exterior siding in beige and khaki, white trim, green shutters & doors and gray/brown asphalt shingles.

 

TRAFFIC

  1. The 28 residential condominiums would generate 221 trips per day. The AM peak hour is 19 trips. The PM peak hour is 22 trips.
  2. No traffic study is required.

Staff Contact: Dick Moore, 462-3937, Email: dmoore@ci.cary.nc.us

 

ROADWAY DESIGN

No road widening or right-of-way dedication is required of this project based on the Town’s Thoroughfare Plan.

The developer is proposing a "common access drive" to serve the units. The drive is to be owned, maintained and repaired by the homeowners association as written into the restrictive covenants for the project.

Staff Contact: Tammy Spivey, 462-3933, Email: tspivey@ci.cary.nc.us

 

UTILITIES

Water and Sewer: The proposed development will connect to Cary public water and sewer systems. The plan complies with TOC utility standards and policies.

Staff Contact: Shuyan Tian, 469-4381, Email: stian@ci.cary.nc.us

 

STORM WATER

The project meets all of the requirements of the Town of Cary stormwater section.

Staff Contact: Tom Horstman, 469-4347, Email: thorstma@ci.cary.nc.us

 

PROPERTY OWNER NOTIFICATION AND CONCERNS

Adjoining property owners were notified. Staff has received no inquiries regarding this proposed development.