TOWN OF CARY DEVELOPMENT PLAN REPORT
Salem Castle
Project No. 02-SP-039
|
APPLICANT |
OWNER |
|
Integrated Design |
Salem Castle, Inc. |
|
Location: Map: |
The site is located south of East Chatham Street, west of the State Capital Soccer Park, approximately 700' west of the intersection of Trinity Road and East Chatham Street. |
|
Planning & Zoning Board Recommendation: |
The Planning and Zoning Board unanimously recommended approval of the
plan. The recommendation of approval included the following conditions:
Since the Planning and Zoning Board meeting, staff has received a letter from the State (owner of the land for the soccer park) that does not fully commit the Salem Castle applicant to use the Soccer Park parking area. Without this agreement, condition two cannot be met. Possible alternatives would be for the applicant to reduce the square footage and/or uses in the castle or secure additional parking off-site. The applicant is exploring ways to address the parking issue. This issue will need to be resolved before staff can recommend approval of the plan. |
|
Staff Recommendation: |
In accordance with Chapter 14.6.8 of the Unified Development Ordinance, the applicant must submit an application requesting approval to create impervious surface area in a riparian buffer. Staff recommends that the plan be tabled until such time that the applicant has submitted the application. Provided that the application for encroachment into the riparian buffer has been received, staff will recommend approval of the plan with the following conditions:
|
|
PROPOSED SCHEDULE OF MEETINGS |
|
|
PLANNING & ZONING BOARD: |
July 15, 2002 |
|
TOWN COUNCIL: |
September 12, 2002 |
|
PROJECT DESCRIPTION |
|
The plan proposes a retail facility containing 120,000 square feet with three stories, a basement, associated parking, right-of-way dedication, roadway improvements and a sidewalk along east Chatham Street for the length of the property frontage. The property contains 7.94 acres. The building would house retail shops, offices and restaurants and would include areas of assembly that could be used for special events such as weddings. The building would have an architectural form resembling a castle. The number of parking spaces required is 535 based on the variety of uses within this facility (retail, office, restaurant and bar). The applicant is requesting the use of shared parking credit of 35% since nearly half of the uses (retail shops and offices) share a different parking peak than the other half (restaurant and bar). This reduces the requirement to 348 spaces, 43 spaces less than shown on the proposed site plan (305 spaces are shown on the plan). The applicant is also requesting a parking reduction by Council. Staff estimates a 12.4% reduction is needed to satisfy the parking ordinance unless a shared parking agreement can be secured with the adjoining soccer park. This site plan includes a pedestrian and vehicular access from south of Salem Castle to the adjoining soccer park where parking could be shared. The applicant advises that the State Capital Soccer Park has granted permission for up to 90 parking spaces to be used by Salem Castle and that a letter verifying the parking reservation would be available to staff prior to the upcoming Planning and Zoning Board meeting. |
|
PARCEL INFORMATION |
||
|
Parcel # |
Realid # |
Area |
|
0774.18-22-8440 |
0067278 |
1.33 |
|
ZONING AND LAND USE PLAN COMPLIANCE |
| Current
Zoning: Business-2 Conditional Use
District (B-2 CU)
Overlay District: N/A Town Limits: [ X ] In Land Use Compliance: The Land Use Plan calls for commercial development. Excluding the following issues, the plan complies with all zoning requirements:
2. Design Guidelines:
Staff is concerned about the proposed castle meeting the architecture requirements in our appearance ordinance. Presently, there is no dominant architecture form with the nearby properties to bring about compatibility. Given staff concerns with the appearance, we support the castle being located further away from East Chatham Street. Although this would place all the parking in front of the castle, staff feels that this placement would mitigate the architectural impacts of this building. In addition, staff has required an opaque screen of evergreen trees to screen the parking and the building from East Chatham Street. The applicant has proposed to placed the building further away from East Chatham Street to take advantage of the lower elevation and better topography. The applicant has also agreed with the Type A streetscape along East Chatham Street.
|
|
LANDSCAPE |
|
Excluding the need for an understory evergreen screen in the southwestern 65' buffer, the plan complies with all landscape requirements and with staff recommendations. (The applicant has agreed to add the required under-story evergreen screen to the southwestern 65' buffer area.) |
|
BUILDING ELEVATION |
|
Building Height: Approx. 70' (Three-story with basement) Building Size: 120,000 square feet Building Materials: Tilt-up concrete panels and E.I.F.S. Building Color: Natural stone color concrete panels and white E.I.F.S. |
|
TRAFFIC |
|
1. Traffic Study Results: The results of the traffic impact analysis are presented in the "Traffic Impact and Access Study" prepared by Wilbur Smith Associates March 2001. This study was part of 00-REZ-37 review. The project proposal is to construct a unique type of entertainment complex to be known as Salem Castle. This proposal has a small trip change from the proposal studied in the rezoning. ADT AM Peak PM Peak Traffic Study trips(ITE) 3,630 Not Studied 313 Existing Proposal trips(ITE) 3,879 49 347 The ADT trips for the existing Salem Castle proposal assumes morning traffic flow to the high turnover restaurant in ITE trip generation tables. Since the restaurant will not be open in the morning, ADT volumes for Salem Castle will be less than ITE. The traffic study remains valid. Access to/from the site will be provided via E. Chatham Street, just west of Trinity Road. The study area included the following four intersections: E. Chatham Street at NE Maynard Road E. Chatham Street at Trinity Road NC 54 at NE Maynard Road NC 54 at Trinity Road Weekday PM (4:00-6:00pm) peak period traffic volume data was used in this analysis. The buildout of the site is expected in 2002. NC 54 at its intersection with Maynard Road is expected to be improved to a four-lane divided cross-section by 2002. The traffic signal operation will also be improved. Review of the intersection analysis indicates that the proposed project has a minor impact at study area intersections. Project traffic does not result in the degradation of service levels at any of the study area intersections. Based on this, no off-site roadway improvements are necessary to meet the Town’s APF Ordinance. See Table 6 below. |
|
Staff Contact: Dick Moore, 462-3937, Email: dmoore@ci.cary.nc.us |
|
ROADWAY DESIGN |
|
The developer of Salem Castle is responsible for the road widening along the project frontage. |
|
Staff Contact: Tammy Spivey, 462-3933, Email: tspivey@ci.cary.nc.us |
Table 6
LEVEL-OF-SERVICE SUMMARY
|
Signalized |
Time |
Existing |
2002 No-Build |
2002 Build |
|||||||||||
|
Intersections |
Period |
Delay 1 |
V/C 2 |
LOS 3 |
Delay |
V/C |
LOS |
Delay |
V/C |
LOS |
|||||
|
E. Chatham St. at |
PM |
33.5 |
0.86 |
C |
39.9 |
0.89 |
D |
48.9 |
0.99 |
D |
|||||
|
NC 54 at N. E. Maynard Road |
PM |
49.8 |
1.01 |
D |
35.9 |
0.83 |
D |
41.4 |
0.89 |
D |
|||||
|
NC 54 at Trinity Road |
PM |
14.2 |
0.58 |
B |
13.6 |
0.60 |
B |
13.8 |
0.61 |
B |
|||||
|
Unsignalized Intersection |
|||||||||||||||
|
E. Chatham Street at Trinity Road |
PM |
14.4 |
- |
B |
15.1 |
- |
C |
18.2 |
- |
C |
|||||
GENERAL NOTES:
|
|||||||||||||||
|
UTILITIES |
|
Water: The proposed development has access to TOC public water via the existing waterline on E. Chatham Street. Sewer: Sewer service to the site will be provided via an existing sanitary sewer on the property. Water and sewer design complies with TOC utility standards and policies in general. |
|
Staff Contact: Shuyan Tian, 469-4381, Email: stian@ci.cary.nc.us |
|
STORM WATER |
|
As proposed, the project would impact 0.8 acres of riparian buffer with impervious surface. This impact would require a variance from the Town Council in accordance with Chapter 14.6.8. The applicant is planning to submit a variance application prior to the Planning and Zoning Board meeting; however, due to the late submittal, action on the site plan by Council will be delayed until the variance is scheduled for a public hearing. The variance is a separate item that will need to be acted upon by Council. |
|
Staff Contact: Tom Horstman, 469-4347, Email: thorstma@ci.cary.nc.us |
|
PROPERTY OWNER NOTIFICATION AND CONCERNS |
|
Yes { X } Summary: Adjoining property owners were notified during staff's first review of the site plan. The notice provided adjoining property owners with an overview of the proposed plan. Staff received no inquiries from adjoining property owners regarding this development plan. |