TOWN OF CARY
DEVELOPMENT PLAN REPORT
The Peaks of Cary, Cary Park PUD
Project No. 01-SP-173
|
APPLICANT |
OWNER |
|
Rice & Associates |
RHA Consulting, INC. |
|
Location: Map: |
East of Cary Glen Boulevard, approximately 250' south of the intersection of Carpenter Fire Station Road and Cary Glen Boulevard. |
|
Planning & Zoning Board Recommendation: |
The Planning and
Zoning Board recommended approval of the plan, with a vote of 7 yes votes
to 2 no votes. The recommendation of approval included the following
conditions:
|
|
Staff Recommendation: |
Staff recommends
approval of the plan with the following conditions:
|
|
PROPOSED SCHEDULE OF MEETINGS |
|
|
PLANNING & ZONING BOARD: |
April 15, 2002
(Tabled) May 20, 2002 |
|
TOWN COUNCIL: |
June 13, 2002 |
|
PROJECT DESCRIPTION |
| The plan proposes 230 apartment units on 9.39 acres known as Parcel MR-8 on the Cary Park Master Plan. The apartments would be located in five three-story buildings (four stories including first floor parking under the building). The building height is approximately 43', 3". The maximum density allowed is 25 units per acre, and the minimum density allowed is 15 units per acre, and the proposed density is 24.49 units per acre. An office and pool area would be located in Building 1. The site would be accessed by one drive from Cary Glen Boulevard, the drive would provide access to surface parking and parking located under the buildings. The plan also provides vehicular and pedestrian access to the adjoining southern vacant property. |
|
PARCEL INFORMATION |
||
|
Parcel # |
Realid # |
Area |
|
0735.03-03-5990 |
0289288 |
9.39 acres |
|
ZONING AND LAND USE PLAN COMPLIANCE Current Zoning: Residential-40 District Overlay District: Planned Unit Development (Cary Park), With Multi-family Designation Town Limits: Inside Land Use Compliance: The proposed development complies with the Cary Park Master Plan and most general zoning requirements. The plan has been modified to address all previous staff and Planning and Zoning Board concerns:
As of this writing there are two landscape related zoning requirements that the plan does not meet:
Staff is recommending approval of the plan with the condition that the plan be modified to address these two requirements. |
|
WAKE COUNTY SCHOOL CAPACITY IMPACTS: |
||||
|
Current Enrollment Area Schools |
Building Capacity |
Percent occupied |
Projected Number of Additional Students |
|
|
Elementary |
14,909 |
13,127 |
113.6% |
40 |
|
Middle |
7,596 |
6,456 |
117.7% |
21 |
|
High |
5,629 |
5,100 |
110.4% |
28 |
|
Total for all Area Schools |
28,134 |
24,683 |
114% |
89 |
|
Preschool |
46 |
|||
Current Enrollment and Building Capacity is based on the 20th day of the school year for 2001. School assignment will be determined at the time of development. A list of individual area schools can be reviewed at: School Data
Staff has received for this development a Certificate of Adequate Facilities for Schools from the Wake County School System. The Certificate indicates that adequate seating would be available at designated schools at the time of occupancy. Actual school locations would be announced.
|
LANDSCAPE |
|
The plan currently does not include an opaque screen along Cary Glen Boulevard, and the minimum shrub size for all required shrubs at planting should be 24". The current plan proposes a shrub size ranging from 18" to 24". The plan complies with all other landscape requirements and staff recommendations. |
|
BUILDING ELEVATION |
Building Height: 43'-4"
Building Size: 230 units in five three-story buildings containing a total of 294,281 square feet.
Building Materials & Colors: Red/brown brick, beige siding, green shutters, white trim, and medium brown asphalt shingle roof.
|
TRAFFIC |
|
A Cary Park Development Agreement was approved November 2001. As part of this agreement the developer provides:
As part of this agreement the Town provides:
|
|
Staff Contact: Dick Moore, 462-3937, Email: dmoore@ci.cary.nc.us |
|
ROADWAY DESIGN |
|
No road widening or right-of-way dedication is required of this project based on the Towns Thoroughfare Plan. The plan complies with Town of Cary Standard Specification requirements and staff recommendations. |
|
Staff Contact: Tammy Spivey, 462-3933, Email: tspivey@ci.cary.nc.us |
|
UTILITIES |
|
Water: Water extension meets TOC standards. Sewer: The current plan complies with TOC sewer standards in general. |
|
Staff Contact: Shuyan Tian, 469-4381, Email: stian@ci.cary.nc.us |
|
STORM WATER |
|
The project meets all of the requirements of the Town of Cary storm water section. |
|
Staff Contact: Tom Horstman, 469-4347, Email: thorstma@ci.cary.nc.us |
|
PROPERTY OWNER NOTIFICATION AND CONCERNS |
|
Adjoining property owners were notified. Staff has received no inquiries regarding this proposed development. |