Continued Capital Projects
|
|
|
|
|
Project Number |
Project Name |
Status |
|
FR1007 |
Carpenter Fire Station #7 |
Continue |
|
FR1029 |
Fire Station #8 - |
Continue |
|
FR1035 |
Pumper Replacement - 1221 and 1283 |
Continue |
|
FR1037 |
Fire Station #8 - |
Continue |
|
FR1038 |
Traffic Signal Pre-Emption - Phase II |
Continue |
|
FR1039 |
Aerial Ladder Replacement #1446 |
Continue |
|
FR1040 |
Rescue Truck Replacement #1770 |
Continue |
|
GG1050 |
Storm System Drainage Database |
Continue |
|
GG1061 |
Nitrogen BMP System |
Continue |
|
GG1066 |
Radio System Upgrade |
Continue |
|
GG1067 |
Storm Drainage - Private |
Continue |
|
GG1075 |
Sanitation and Recycling Truck Replacement |
Continue |
|
GG1078 |
CAD System Replacement |
Continue |
|
GG1082 |
Unnamed Tributary - Swift Creek - Phase II |
Continue |
|
GG1083 |
TCAP - |
Continue |
|
GG1085 |
|
Continue |
|
GG1086 |
Higgins Greenway and Stormwater - Phase |
Continue |
|
GG1087 |
EECBG - Emissions Inventory |
Continue |
|
GG1088 |
EECBG - Energy Audit and Improvements |
Continue |
|
GG1089 |
EECBG - Alternative Fuel Vehicles |
Continue |
|
GG1090 |
EECBG - |
Continue |
|
GG1091 |
EECBG - Brooks Park Field Lights |
Continue |
|
GG1092 |
EECBG - Charging Stations |
Continue |
|
GG1093 |
Cameron Pond Revegetation |
Continue |
|
GG1094 |
Weldon Ridge Infrastructure Improvements |
Continue |
|
GG1095 |
Amberly |
Continue |
|
GG5001 |
Land - Miscellaneous Unassigned Expenses |
Continue |
|
GG5003 |
|
Continue |
|
GG5010 |
Land - West Cary Stream Restoration |
Continue |
|
GG5011 |
Land - |
Continue |
|
GG5013 |
Land - |
Continue |
|
GG5014 |
Land - Hillard/Thompson Property |
Continue |
|
GG5015 |
Land - Winslow Property |
Continue |
|
GG6000 |
|
Continue |
|
GG6001 |
|
Continue |
|
GG6002 |
|
Continue |
|
GG6003 |
|
Continue |
|
GG6004 |
|
Continue |
|
GG6005 |
|
Continue |
|
GG6006 |
|
Continue |
|
GG6007 |
|
Continue |
|
GG6008 |
|
Continue |
|
GG7000 |
|
Continue |
|
GG7004 |
|
Continue |
|
GG7005 |
|
Continue |
|
GG7006 |
|
Continue |
|
GG7007 |
|
Continue |
|
GG7008 |
|
Continue |
|
GG7009 |
|
Continue |
|
GG7010 |
|
Continue |
|
GG7011 |
|
Continue |
|
PR1032 |
Batchelor Branch Greenway |
Continue |
|
PR1034 |
|
Continue |
|
PR1035 |
Tryon Road Park/Greenway |
Continue |
|
PR1037 |
|
Continue |
|
PR1039 |
|
Continue |
|
PR1043 |
Speight Branch - Greenway - Phase I |
Continue |
|
PR1048 |
|
Continue |
|
PR1050 |
Black Creek Greenway - Phase IV |
Continue |
|
PR1057 |
White Oak Greenway - Phases |
Continue |
|
PR1060 |
|
Continue |
|
PR1062 |
|
Continue |
|
PR1073 |
US 1/64 Pedestrian Cross |
Continue |
|
PR1074 |
Bartley Parcel - Phase I |
Continue |
|
PR1084 |
|
Continue |
|
PR1093 |
|
Continue |
|
PR1095 |
Amberly |
Continue |
|
PR1098 |
Morris Branch Greenway Underpass |
Continue |
|
PR1100 |
Park and Greenway Renovations - FY 2006 |
Continue |
|
PR1106 |
|
Continue |
|
PR1107 |
Greenway Resurfacing - FY 2007 |
Continue |
|
PR1109 |
TCAP - |
Continue |
|
PR1111 |
|
Continue |
|
PR1112 |
|
Continue |
|
PR1113 |
American Tobacco Trail |
Continue |
|
PR1114 |
Bond Park |
Continue |
|
PR1116 |
Greenway Crosswalk System - FY 2008 |
Continue |
|
PR1117 |
|
Continue |
|
PR1118 |
NC55 Trail Connection - Batchelor Tunnel |
Continue |
|
PR1120 |
|
Continue |
|
PR1122 |
|
Continue |
|
PR1125 |
Higgins Greenway Extension |
Continue |
|
PR1126 |
Swift Creek Greenway Extension |
Continue |
|
PR1127 |
Swift Creek Stream Restoration |
Continue |
|
PR1128 |
AM Howard Farm |
Continue |
|
PR1133 |
Park and Greenway Renovations - FY 2009 |
Continue |
|
PR1134 |
Hemlock Bluffs Renovation |
Continue |
|
PR1135 |
Public Art - Hemlock Bluffs |
Continue |
|
PR1137 |
Public Art - Bus Shelters |
Continue |
|
PR1138 |
Public Art - |
Continue |
|
PR1139 |
|
Continue |
|
PR1140 |
Public Art - TCAP - |
Continue |
|
PR1141 |
|
Continue |
|
PR1142 |
MacDonald Woods Renovation |
Continue |
|
PR1143 |
|
Continue |
|
PR1145 |
Green Hope Elementary Park Improvements |
Continue |
|
PR1147 |
SK8 |
Continue |
|
PR1148 |
|
Continue |
|
PR1149 |
|
Continue |
|
PR1150 |
Annie Jones Greenway Renovation |
Continue |
|
PR1151 |
Old Reedy Creek Road Trail and Park |
Continue |
|
ST1005 |
Maynard Widening - Kildaire/West |
Continue |
|
ST1073 |
Tryon and Piney Plains - Phase I |
Continue |
|
ST1082 |
Fiber Optic Traffic Signal System |
Continue |
|
ST1084 |
Kildaire Farm Widening |
Continue |
|
ST1085 |
|
Continue |
|
ST1091 |
|
Continue |
|
ST1092 |
|
Continue |
|
ST1102 |
|
Continue |
|
ST1104 |
|
Continue |
|
ST1107 |
Traffic Calming |
Continue |
|
ST1113 |
Street Lights - FY 2003 |
Continue |
|
ST1116 |
Sidewalk Improvements - FY 2004 |
Continue |
|
ST1120 |
|
Continue |
|
ST1123 |
|
Continue |
|
ST1128 |
|
Continue |
|
ST1129 |
Traffic Signals - FY 2005 |
Continue |
|
ST1131 |
Thoroughfare Street Lighting |
Continue |
|
ST1135 |
Sidewalk Improvements - FY 2006 |
Continue |
|
ST1143 |
Traffic Signals - FY 2006 |
Continue |
|
ST1146 |
Annexation Areas - Street Repavement |
Continue |
|
ST1147 |
Sidewalk Improvements - FY 2007 |
Continue |
|
ST1151 |
|
Continue |
|
ST1152 |
Kildaire Farm Widening - Penny to 1010 |
Continue |
|
ST1156 |
Street Storm Drainage Rehabilitation - FY 2007 |
Continue |
|
ST1157 |
Traffic Signals - FY 2007 |
Continue |
|
ST1158 |
TCAP - |
Continue |
|
ST1160 |
|
Continue |
|
ST1163 |
Sidewalk Improvements - FY 2008 |
Continue |
|
ST1167 |
Connectivity Project - FY 2008 |
Continue |
|
ST1168 |
|
Continue |
|
ST1173 |
Traffic Signals - FY 2008 |
Continue |
|
ST1176 |
NC55 Widening - E30 Elementary School |
Continue |
|
ST1177 |
|
Continue |
|
ST1179 |
Sidewalk Improvements - FY 2009 |
Continue |
|
ST1180 |
Bicycle Facility Implementation - FY 2009 |
Continue |
|
ST1182 |
Connectivity Project - FY 2009 |
Continue |
|
ST1183 |
Bridge/Culvert Repairs - FY 2009 |
Continue |
|
ST1184 |
Railroad Crossing Repairs - FY 2009 |
Continue |
|
ST1185 |
Street Improvements - FY 2009 |
Continue |
|
ST1187 |
Traffic Signals - FY 2009 |
Continue |
|
ST1190 |
US1/64 |
Continue |
|
ST1191 |
Weston Parkway/Winstead Improvements |
Continue |
|
ST1192 |
|
Continue |
|
ST1193 |
|
Continue |
|
ST1195 |
Street Improvements -FY 2010 |
Continue |
|
ST1196 |
Sidewalk Improvements - FY 2011 |
Continue |
|
ST1197 |
|
Continue |
|
ST1198 |
Traffic Signals - FY 2011 |
Continue |
|
ST1199 |
Bridge/Culvert Repairs - FY 2011 |
Continue |
|
ST1200 |
Railroad Crossing Repairs - FY 2011 |
Continue |
|
ST1201 |
Street Improvements - FY 2011 |
Continue |
|
ST1202 |
|
Continue |
|
ST6000 |
|
Continue |
|
ST6001 |
|
Continue |
|
ST6002 |
|
Continue |
|
ST6003 |
|
Continue |
|
ST6004 |
|
Continue |
|
ST6005 |
|
Continue |
|
ST6006 |
|
Continue |
|
ST6007 |
|
Continue |
|
ST6008 |
|
Continue |
|
ST6009 |
|
Continue |
|
ST6010 |
|
Continue |
|
ST6011 |
|
Continue |
|
ST6012 |
|
Continue |
|
ST6013 |
|
Continue |
|
ST6014 |
|
Continue |
|
ST6015 |
|
Continue |
|
ST6016 |
|
Continue |
|
ST6017 |
|
Continue |
|
ST6018 |
|
Continue |
|
SW1024 |
Inflow/Infiltration Elimination/Manhole Repair |
Continue |
|
SW1047 |
|
Continue |
|
SW1053 |
|
Continue |
|
SW1063 |
Wastewater System Flow Monitoring Study |
Continue |
|
SW1065 |
Morris Branch Regional Pump Station |
Continue |
|
SW1074 |
Hollybrook Sewer Extension Pump Station Elimination |
Continue |
|
SW1076 |
Rocky Branch Sewer and Pump Station Elimination |
Continue |
|
SW1087 |
Annexation Lines - Sewer |
Continue |
|
SW1091 |
Force Main Discharge Manhole Coatings |
Continue |
|
SW1095 |
Batchelor Branch Interceptor and Fieldstone Pump Station |
Continue |
|
SW1097 |
|
Continue |
|
SW1102 |
NCWRF - Odor Control |
Continue |
|
SW1103 |
Northwest Area Reclaimed Water - Phase I |
Continue |
|
SW1105 |
|
Continue |
|
SW1109 |
WWRWMF - Design and Phase IV Planning/Permitting |
Continue |
|
SW1111 |
WWRWMF - |
Continue |
|
SW1112 |
SCWRF Odor Control |
Continue |
|
SW1113 |
WWRWMF - Organizational and Financial Development |
Continue |
|
SW1115 |
|
Continue |
|
SW1121 |
Wastewater SCADA |
Continue |
|
SW1123 |
WWRWMF-New Water Reclamation Facility |
Continue |
|
SW1124 |
WWRWMF - Effluent Pump Station |
Continue |
|
SW1125 |
WWRWMF - Project Management |
Continue |
|
SW1127 |
MM - Telemetry Upgrade - Morrisville Pump Station |
Continue |
|
SW1130 |
Green Level Interceptor |
Continue |
|
SW1132 |
MM - |
Continue |
|
SW1134 |
MM - Replacement/Rehabilitation Sewer Mains - FY 2007 |
Continue |
|
SW1137 |
Network Conversion NCWRF and SCWRF |
Continue |
|
SW1138 |
Northwest Area Reclaimed Water Project - Phase II |
Continue |
|
SW1143 |
WWRWMF - |
Continue |
|
SW1144 |
WWRWMF - |
Continue |
|
SW1145 |
WWRWMF - West Reedy Branch Gravity Sewer Interceptor |
Continue |
|
SW1146 |
WWRWMF - Beaver Creek Pump Station |
Continue |
|
SW1147 |
WWRWMF - Beaver Creek Force |
Continue |
|
SW1148 |
WWRWMF - SCADA |
Continue |
|
SW1151 |
Highcroft Sewer Easements |
Continue |
|
SW1153 |
Sewer Line Relocation NCDOT U4026 |
Continue |
|
SW1154 |
Biosolids Aeration System Improvements |
Continue |
|
SW1155 |
Crabtree/York Interceptor Improvements |
Continue |
|
SW1156 |
Force Main Inspection and Rehabilitation - FY 2008 |
Continue |
|
SW1157 |
MM - NW |
Continue |
|
SW1159 |
MM-Replacement/Rehabilitation Sewer Mains - FY 2008 |
Continue |
|
SW1161 |
Morrisville Public Works - Barscreen Addition |
Continue |
|
SW1162 |
Northwest Area Reclaimed Water - Phase |
Continue |
|
SW1163 |
|
Continue |
|
SW1167 |
Replacement/Rehabilitation Sewer Mains - FY 2008 |
Continue |
|
SW1169 |
Sewer System Master Plan |
Continue |
|
SW1170 |
Swift Creek Pump Station Parallel Force |
Continue |
|
SW1171 |
Swift Creek Regional Pump Station Improvements |
Continue |
|
SW1172 |
|
Continue |
|
SW1173 |
Upper |
Continue |
|
SW1174 |
|
Continue |
|
SW1175 |
Wastewater Pump Station Improvement |
Continue |
|
SW1176 |
Wastewater Pump Station Parallel Force |
Continue |
|
SW1178 |
WWRWMF - Beaver Creek Gravity Sewer |
Continue |
|
SW1179 |
WWRWMF - Beaver Creek Trunk Sewer |
Continue |
|
SW1180 |
WWRWMF - |
Continue |
|
SW1181 |
WWRWMF - Effluent Pipeline - Phase I |
Continue |
|
SW1182 |
WWRWMF - Effluent Pipeline - Phase II |
Continue |
|
SW1183 |
|
Continue |
|
SW1184 |
Carystone Pump Station Elimination |
Continue |
|
SW1185 |
Concourse Interceptor Parallel Sewer |
Continue |
|
SW1186 |
|
Continue |
|
SW1189 |
|
Continue |
|
SW1191 |
Paramount Pump Station Elimination |
Continue |
|
SW1192 |
|
Continue |
|
SW1194 |
Replacement/Rehabilitation Sewer Mains - FY2009 |
Continue |
|
SW1196 |
Stirrup Iron Interceptor Parallel Sewer |
Continue |
|
SW1197 |
Triangle Parkway Sewer Conflicts |
Continue |
|
SW1198 |
|
Continue |
|
SW1200 |
WWRWMF - Site 14 Water and Sewer Mitigation |
Continue |
|
SW1202 |
Force Main Inspection and Rehabilitation - FY 2010 |
Continue |
|
SW1203 |
Cleaning and Video Surveying Sewer Interceptors |
Continue |
|
SW1204 |
Improved Screen - NCWRF Bar Screen |
Continue |
|
SW1205 |
Dutchman's Branch Regional Pump Station/Force Main & Interceptor |
Continue |
|
SW1206 |
Reedy Creek Regional Pump Station/Force Main Interceptor |
Continue |
|
SW1207 |
Extend Reclaimed Water Mains |
Continue |
|
SW1208 |
MM - Reclaimed Water Line Oversizings - FY 2011 |
Continue |
|
SW1209 |
Reclaimed Water Line Oversizings - FY 2011 |
Continue |
|
SW1210 |
Reclaimed Water - Elevated Storage |
Continue |
|
SW1211 |
Upgrade Reclaimed System Master Plan |
Continue |
|
SW1212 |
Replacement/Rehabilitation Sewer System - FY 2011 |
Continue |
|
SW1213 |
MM - Sanitary Sew Oversizings - FY 2011 |
Continue |
|
SW1214 |
Sanitary Sewer Oversizings - FY 2011 |
Continue |
|
SW1215 |
MM - Upgrade to Wastewater Pump Station at |
Continue |
|
SW1216 |
NCWRF Sampling and Process Control |
Continue |
|
SW1217 |
SCWRF Headworks Upgrades |
Continue |
|
SW1218 |
SCWRF Storage Capacity - Reclaimed Water |
Continue |
|
SW5005 |
Annexation - Summerwinds I and II |
Continue |
|
SW5006 |
Annexation - |
Continue |
|
SW5015 |
Annexation - |
Continue |
|
SW5016 |
Annexation - |
Continue |
|
WT1054 |
|
Continue |
|
WT1070 |
Water Resource Planning and Management |
Continue |
|
WT1073 |
|
Continue |
|
WT1075 |
Kildaire Spheroid Tank |
Continue |
|
WT1077 |
|
Continue |
|
WT1089 |
Optimist |
Continue |
|
WT1094 |
Annexation Lines - Water |
Continue |
|
WT1097 |
NC55 Water Line Extension - Phase II |
Continue |
|
WT1098 |
|
Continue |
|
WT1104 |
|
Continue |
|
WT1107 |
Kildaire Farm Water Line Reinforcement - South |
Continue |
|
WT1109 |
|
Continue |
|
WT1114 |
Water Line Upgrade - FY 2005 |
Continue |
|
WT1116 |
MM - Utility Merger Study |
Continue |
|
WT1118 |
Elevated Storage Tank Repainting - Ridgeview |
Continue |
|
WT1120 |
TCAP - Water Line Upgrades |
Continue |
|
WT1121 |
Water Line Upgrades - FY 2006 |
Continue |
|
WT1123 |
Automated Meter |
Continue |
|
WT1124 |
|
Continue |
|
WT1125 |
CAWTP - Phase II Residuals and Chemical Feed Facilities |
Continue |
|
WT1126 |
CAWTP -Ozone Generating Cooling |
Continue |
|
WT1127 |
CAWTP -Sodium Hypochlorite Tank Replacement |
Continue |
|
WT1128 |
|
Continue |
|
WT1129 |
Green Level West Water Line - Phase I |
Continue |
|
WT1130 |
Large Valve Repair/Replacement - FY 2007 |
Continue |
|
WT1131 |
MM - Large Water Meter Replacement - FY 2007 |
Continue |
|
WT1132 |
MM - Master Meter Installation |
Continue |
|
WT1133 |
MM - Water Audit |
Continue |
|
WT1135 |
MM - Upgrade Water Line - FY2007 |
Continue |
|
WT1138 |
Water Line Upgrades - FY 2007 |
Continue |
|
WT1141 |
Water System Master Plan |
Continue |
|
WT1142 |
|
Continue |
|
WT1144 |
Hawes Water Line |
Continue |
|
WT1145 |
Water Line Relocation NCDOT U4026 |
Continue |
|
WT1147 |
CAWTP Phase II Pumping |
Continue |
|
WT1148 |
CAWTP Phase |
Continue |
|
WT1149 |
Large Valve Repair/Replacement - FY 2008 |
Continue |
|
WT1150 |
MM - Large Water Meter Replacement |
Continue |
|
WT1151 |
Small Diameter Water Line Reinforcement - FY 2008 |
Continue |
|
WT1153 |
Water Line Upgrades - FY 2008 |
Continue |
|
WT1154 |
Walnut Street Water Line Reinforcement |
Continue |
|
WT1156 |
Water System Monitoring Protection |
Continue |
|
WT1160 |
Carpenter |
Continue |
|
WT1161 |
|
Continue |
|
WT1163 |
CAWTP - Supplemental Water Supply |
Continue |
|
WT1164 |
Eagle |
Continue |
|
WT1165 |
High House Western Pressure Zone Water Line |
Continue |
|
WT1166 |
|
Continue |
|
WT1167 |
Large Valve Repair/Replacement - FY 2009 |
Continue |
|
WT1168 |
|
Continue |
|
WT1169 |
MM - Large Water Meter Replacement - FY 2009 |
Continue |
|
WT1171 |
|
Continue |
|
WT1172 |
Old |
Continue |
|
WT1173 |
Triangle Parkway Water Conflicts |
Continue |
|
WT1174 |
Water Line Upgrades - FY 2009 |
Continue |
|
WT1176 |
Water Tank Site Acquisition |
Continue |
|
WT1177 |
|
Continue |
|
WT1178 |
Jenks-Carpenter / |
Continue |
|
WT1179 |
Small Diameter Water Line Reinforcement - FY 2010 |
Continue |
|
WT1180 |
|
Continue |
|
WT1182 |
MM - Upgrade Water Lines - FY 2011 |
Continue |
|
WT1183 |
MM - Water Line Oversizings - FY 2011 |
Continue |
|
WT1184 |
|
Continue |
|
WT1185 |
|
Continue |
|
WT1186 |
Southern Pressure Zone US1 Water Line and Valves |
Continue |
|
WT1187 |
Water Line Upgrades - FY 2011 |
Continue |
|
WT1188 |
Water Line Oversizings - FY 2011 |
Continue |
|
WT1189 |
|
Continue |
|
WT1190 |
Water Infrastructure Security |
Continue |
|
WT1191 |
Water Main Condition Assessment Program |
Continue |
|
WT1192 |
Water Treatment Plant Laboratory Equipment - Atomic Adsorption Unit |
Continue |
|
WT5005 |
Annexation - Summerwinds I and II |
Continue |
|
WT5006 |
Annexation - |
Continue |
|
WT5015 |
Annexation - |
Continue |
|
WT5016 |
Annexation - |
Continue |