DEPARTMENT OF  
  Parks, Recreation
  and Cultural
  Resources

 

Banner

Annie Jones Greenway

NOTICE:  Phase II will be under construction for a six month period starting in early
May 2013.
 Learn more at the project page.




 

AnnieJonesGreenway  

Most parts of this greenway are following small streams and the whole trail is in deep woods.

Annie Jones Greenway has an unpaved section that runs from McCloud Court through Annie Jones Park and ends at the paved section. The paved part starts at the intersection of Lake Pine Dr. and Cary Parkway and ends at Gatehouse Dr.  The unpaved sections are currently in design to be upgraded to asphalt pavement.


GreenwaySign

GREENWAY OVERVIEW

AnnieJonesGreenwayMap


ENTRANCES

Parking is available at Annie Jones Park
on Tarbert Drive.  Elsewhere the only parking is on-street.

Length:  1.2 miles
Trail Width/Surface:  6-10 foot wide asphalt
Used For:  Walking, running, bicycling, walking leashed dogs, pushing strollers
Hours:  Dawn to Dusk
Special Considerations:  some sections unpaved, steps at McCloud Court
Restrooms:  at  Annie Jones Park
Features:  Playground between Tarbert and Gatehouse Drive
Benches:  Yes
Connects To:  Annie Jones Park

DIRECTIONS

Annie Jones Park entrance:  From the west end of the parking area at Annie Jones Park, the unpaved trail heads west 0.2 miles to McCloud Court, ending with three steps up to the road.

Tarbert Drive entrance (opposite Annie Jones Park):
The unpaved Annie Jones Greenway heads southeast along a small stream for 0.3 miles until it intersects with the paved portion.  At that junction, the right branch ends in 0.2 miles at the northwest corner of Lake Pine Drive and Cary Parkway.  The left branch crosses Tarbert Drive, passes a small playground and ends in 0.4 miles at Gatehouse Drive.


 

Google Map
Location

Bike Hike Map
 2013 Bike Hike Web Cover

For More
Information
Contact Us:
919-469-4061