Permit Required

State law requires that permits be obtained before beginning these types of projects:

  • Construction, reconstruction, alteration, repair, movement to another site, removal or demolition of any building
  • Installation, extension, alteration or general repair of any plumbing system; heating or cooling equipment system; or any electrical wiring, devices, appliances or equipment
While this law was meant to be all encompassing, some projects do not require permits from the Town of Cary.

No Permit Required

  • Replacement of non-structural cosmetic building elements such as: floor and wall coverings; moldings and trim; cabinets and casework; roof coverings with the same materials, etc.
  • Residential accessory buildings that are no more than 12 feet in any dimension
  • Replacement of electrical fixtures and components when work is not done within the wall or ceiling cavity or behind the finished wall or ceiling surface
  • Replacement of plumbing fixtures when the work does not go beyond the trap seal
  • Installation of low voltage exterior landscape lighting