Photo of Cary Parkway Image of stenciled stormdrain Image of construction hard hat Image of winding road

Standard Specifications

Adopted July 10, 1980
Revisions Adopted April 14, 1985
Revisions Adopted July, 1985
Revisions Adopted December 13, 1986
Revisions Adopted October 13, 1988
Revisions Adopted July 25, 1990
Revisions Adopted July 22, 1993
Revisions Adopted April 8, 1999
Revisions Adopted April15, 2004
Revisions Adopted September 8, 2005
Revisions Adopted August 24, 2007
Revisions Adopted December 10, 2009

PDF Title
PDF Cover Sheet
PDF Table of Contents
PDF Preface
PDF Section 01000 Definitions & Abbreviations
PDF Section 02000 General Provisions
PDF Section 03000 Streets
PDF Section 04000 Soil Erosion, Sedimentation, Landscaping
PDF Section 05000 Utility Trenches
PDF Section 06000 Water Distribution Systems
PDF Section 06200 Cross Connection Control
PDF Section 06500 Reclaimed Water Distribution System
PDF Section 07000 Sanitary Sewer
PDF Section 07200 Wastewater Force Mains
PDF Section 07500 Wastewater Pumping Systems
PDF Section 08000 Storm Drainage
PDF Section 09000 Greenway Construction
PDF Section 10000 Record Drawing Check List

Contact

Please provide feedback to:

Definitions, General Provisions, Streets:
Kristen Dwiggins at (919) 462-3930 or kristen.dwiggins@townofcary.org

Soil Erosion, Storm Drainage:
Matt Flynn at (919) 469-4347 or matt.flynn@townofcary.org

Pipe Trenches, Water Distribution, Cross Connection Control, Reclaimed Water Distribution, Wastewater Collection; Wastewater Pumping:
Glen Harrell at (919) 460-4933 or glen.harrell@townofcary.org
Robert Hirt at (919) 481-5099 or robert.hirt@townofcary.org

Record Drawings:
David Johnson at (919) 462-3832 or david.johnson@townofcary.org